(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

ORII AND MEC Adjuster Bolt

Days to Ship
  • All
  • Same day
  • 1 Day(s) or Less
  • 6 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 14 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Thread Length L1(mm)
Nominal of Thread M(mm)
Type
Main Body Height E(mm)
Adjusting Bolt Shape Type
Body Material
Properties
Bottom Rubber Material
Mounting Shape Type
Thread Material
Main Body Surface Treatment
Swivel Angle θ(deg)
Height Adjusting Handle
Thread Surface Treatment
Swivel Mechanism

    Level Pad LP

    Brand

    ORII AND MEC

    Product Series

    Level Pad LP

    CAD
    • 2D
    Days to Ship Same day
    Thread Length L1(mm)90
    Nominal of Thread M(mm)18
    TypeMounting
    Main Body Height E(mm)70
    Adjusting Bolt Shape Type-
    Body MaterialCast Iron
    Properties-
    Bottom Rubber Material-
    Mounting Shape TypeRubber Mount Type
    Thread MaterialSteel
    Main Body Surface Treatment-
    Swivel Angle θ(deg)-
    Height Adjusting HandleProvided
    Thread Surface Treatment-
    Swivel MechanismNot Provided

    Loading...

    1. 1

    Related Categories to Adjuster Bolt