(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

ABC Channel【5-40 Pieces Per Package】 (Part Numbers)

ABC Channel

Use as structural material for wiring board, cubicle, and control panel, and the like.

[Features]
• You can perform design changes, expansions, and renovations as the user like.
• Since outer box sheet metal processing and inner wiring are advanced through separate processes, the delivery time can be shortened.
• If an equipment and parts wiring diagram is available, the user can proceed with assembly wiring without waiting for completion of the casing box.
• Includes easy-to-use A.B.C. parts for the A.B.C. channel; improved efficiency.

* The characteristics of molten zinc plating process result in plating film left on the angle length hole, and in roughness in the surface finish. Please be aware of this.

(i)Caution

  • The product images are representative images only. Specifications may differ for each part number, including shape and color.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A-25SE
A-25SZN
A-25WE
A-25WZN
A-30SE
A-30WE
A-40/8SE
A-40/8WE
A-40SE
A-40WE
A-50SE
A-50SN
A-50WE
B-19E
B-19N-5P
B-25E
B-36E
C-19E
C-20E
C-20E19
C-22E
C-23E
C-29E
C-30/10E
C-30E
C-30E24
C-44E
C-44HE
CC-35E
CL-40E
Part NumberStandard Unit PriceNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountDays to ShipRoHSMaterial/surface treatment Length
(mm)
Screw specifications Features Slit width × slit length
(mm)
Number with packs
(Piece)

4,155,928 IDR

20 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating25×25×1800-Angle / Slit on one side7×40-

4,523,731 IDR

20 Pieces Per Package

1 Pack(s) 17 Day(s) or more -SPHC steel / hot-dip galvanizing25×25×1800-Angle / Slit on one side7×40-

4,137,790 IDR

20 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating25×25×1800-Angle / Slit on both sides7×40-

4,505,593 IDR

20 Pieces Per Package

1 Pack(s) 17 Day(s) or more -SPHC steel / hot-dip galvanizing25×25×1800-Angle / Slit on both sides7×40-

3,906,847 IDR

10 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating30×30×2400-Angle / Slit on one side8.3×40-

3,864,525 IDR

10 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating30×30×2400-Angle / Slit on both sides8.3×40-

2,712,561 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating40×40×2400-Angle / Slit on one side8.3×40-

2,664,193 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating40×40×2400-Angle / Slit on both sides8.3×40-

2,712,561 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating40×40×2400-Angle / Slit on one side11×40-

2,652,101 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating40×40×2400-Angle / Slit on both sides11×40-

4,723,617 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating50×50×2400-Angle / Slit on one side13×40-

3,689,324 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / none50×50×2400-Angle / Slit on one side13×40-

4,620,628 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating50×50×2400-Angle / Slit on both sides13×40-

5,496,212 IDR

40 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating19×3×2000-Flat bar6.2×22-

760,393 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more 10-19 x 3 x 2000Iron / noneFlat Bar6.2 x 225

4,760,811 IDR

40 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating25×2.3×1800-Flat bar7×40-

4,523,731 IDR

20 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating3.2×36×1800-Flat bar11×40-

3,733,797 IDR

40 Pieces Per Package

1 Pack(s) 13 Day(s) or more -SPHC steel / trivalent chromate plating19.4×8×1800-Channel6×13-

4,013,318 IDR

40 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating22.2×7×1800-Channel6.2×15-

4,570,864 IDR

40 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating22.2×7×1920-Channel6.2×15-

4,301,057 IDR

40 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating22.2×7×1800-Channel7×40-

5,422,400 IDR

40 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating23.6×7×1800-Channel7×40-

2,900,518 IDR

20 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating29.2×10×1800-Channel7×40-

1,041,369 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating30.6×11×1800-Channel8.3×40-

3,644,255 IDR

20 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating30.6×11×1800-Channel8.3×40-

4,555,253 IDR

20 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating30.6×11×2400-Channel8.3×40-

2,491,238 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating44.4×17×2400-Channel11×40-

3,290,168 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating44.4×25×2400-Channel11×40-

5,733,269 IDR

10 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating35×20×1900-Channel8.3×40-

4,320,796 IDR

5 Pieces Per Package

1 Pack(s) 10 Day(s) or more -SPHC steel / trivalent chromate plating40×77×2400-Channel13×40-

Loading...

  1. 1

Basic Information

Type Channel/Rail

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)