(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Screw-In Type Malleable Cast Iron Pipe Fitting 45° Elbow (Part Numbers)

Screw-In Type Malleable Cast Iron Pipe Fitting 45° Elbow

[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
45L-B-1
45L-B-1/2
45L-B-1/4
45L-B-2
45L-B-3
45L-B-3/4
45L-B-3/8
45L-B-4
45L-B-5
45L-B-6
45L-B-11/2
45L-B-11/4
45L-B-21/2
45L-W-1
45L-W-1/2
45L-W-1/4
45L-W-2
45L-W-3
45L-W-3/4
45L-W-3/8
45L-W-4
45L-W-5
45L-W-6
45L-W-11/2
45L-W-11/4
45L-W-21/2
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

84,333 IDR

1 Piece(s) 12 Day(s) or more 1B(25A)No

57,333 IDR

1 Piece(s) 12 Day(s) or more 1/2B(15A)No

65,167 IDR

1 Piece(s) 12 Day(s) or more 1/4B(8A)No

257,500 IDR

1 Piece(s) 12 Day(s) or more 2B(50A)No

556,667 IDR

1 Piece(s) 12 Day(s) or more 3B(80A)No

61,833 IDR

1 Piece(s) 12 Day(s) or more 3/4B(20A)No

65,167 IDR

1 Piece(s) 12 Day(s) or more 3/8B(10A)No

1,686,333 IDR

1 Piece(s) 16 Day(s) or more 4B(100A)No

4,678,391 IDR

1 Piece(s) 18 Day(s) or more 4B(100A)No

7,097,836 IDR

1 Piece(s) 18 Day(s) or more 6B(150A)No

173,167 IDR

1 Piece(s) 12 Day(s) or more 1 1/2B(40A)No

130,500 IDR

1 Piece(s) 12 Day(s) or more 1 1/4B(32A)No

556,667 IDR

1 Piece(s) 12 Day(s) or more 2 1/2B(65A)No

52,973 IDR

1 Piece(s) 12 Day(s) or more 1B(25A)Zinc Plating

39,838 IDR

1 Piece(s) 12 Day(s) or more 1/2B(15A)Zinc Plating

43,591 IDR

1 Piece(s) 12 Day(s) or more 1/4B(8A)Zinc Plating

154,500 IDR

1 Piece(s) 12 Day(s) or more 2B(50A)Zinc Plating

556,667 IDR

1 Piece(s) 12 Day(s) or more 3B(80A)Zinc Plating

42,183 IDR

1 Piece(s) 12 Day(s) or more 3/4B(20A)Zinc Plating

43,591 IDR

1 Piece(s) 12 Day(s) or more 3/8B(10A)Zinc Plating

1,686,333 IDR

1 Piece(s) 16 Day(s) or more 4B(100A)Zinc Plating

4,678,391 IDR

1 Piece(s) 18 Day(s) or more 4B(100A)Zinc Plating

7,097,836 IDR

1 Piece(s) 18 Day(s) or more 6B(150A)Zinc Plating

103,833 IDR

1 Piece(s) 12 Day(s) or more 1 1/2B(40A)Zinc Plating

78,167 IDR

1 Piece(s) 12 Day(s) or more 1 1/4B(32A)Zinc Plating

556,667 IDR

1 Piece(s) 12 Day(s) or more 2 1/2B(65A)Zinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape 45° Elbow Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 1 Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)