(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
This translation is a Google translation Terjemahan ini adalah terjemahan Google
Lightweight and low cost mechanical pipe fitting with excellent corrosion resistance.
[Features]
· Low cost was achieved by simplifying the components while adopting SUS316, which is highly resistant to rust and other corrosion, for the main body (U bar structure is patented).
· Compact and lighter than other fittings in spite of high performance.
· Therefore, construction in narrow work spaces is easy.
· Secondary processing such as threading and grooving is not required at all due to unique a structure that prevents pipe disconnection, thus enabling reductions in processing cost and working time.
Japanese Only
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Applicable Plumbing | Applicable Fluid | Nominal Diameter | Maximum Pressure Gas used [There are limites in the usage condition] (MPa) | Rubber Sleeve Material | Inner Plate |
---|---|---|---|---|---|---|---|---|---|---|
793,442 IDR | 1 Piece(s) | 11 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 20A | 1.6 | EPDM | No | ||
873,904 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 20A | 1.6 | NBR | No | ||
821,821 IDR | 1 Piece(s) | 11 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 25A | 1.6 | EPDM | No | ||
903,087 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 25A | 1.6 | NBR | No | ||
970,792 IDR | 1 Piece(s) | 12 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 32A | 1.6 | EPDM | No | ||
932,498 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 32A | 1.6 | NBR | No | ||
1,031,109 IDR | 1 Piece(s) | 12 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 40A | 1.6 | EPDM | No | ||
990,635 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 40A | 1.6 | NBR | No | ||
1,131,973 IDR | 1 Piece(s) | 11 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 50A | 1.6 | EPDM | No | ||
1,063,365 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 50A | 1.6 | NBR | No | ||
1,591,843 IDR | 1 Piece(s) | 12 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 65A | 1.6 | EPDM | No | ||
1,412,876 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 65A | 1.6 | NBR | No | ||
1,529,607 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 80A | 1.6 | EPDM | No | ||
1,529,607 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 80A | 1.6 | NBR | No | ||
1,689,429 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 100A | 1.6 | EPDM | No | ||
1,719,980 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 100A | 1.6 | NBR | No | ||
2,694,643 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 125A | 1.6 | EPDM | No | ||
2,694,643 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 125A | 1.6 | NBR | No | ||
3,466,623 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 150A | 1.3 | EPDM | No | ||
3,466,623 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 150A | 1.3 | NBR | No | ||
7,049,736 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 200A | 1.0 | EPDM | No | ||
7,049,736 IDR | 1 Piece(s) | 13 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 200A | 1.0 | NBR | No | ||
946,861 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 20A | 1.6 | EPDM | Equipped Products | ||
946,861 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 20A | 1.6 | NBR | Equipped Products | ||
990,635 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 25A | 1.6 | EPDM | Equipped Products | ||
990,635 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 25A | 1.6 | NBR | Equipped Products | ||
1,027,114 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Chemical | 32A | 1.6 | EPDM | Equipped Products | ||
1,027,114 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe | Water / Air / Organic Gas / Oils and Fats | 32A | 1.6 | NBR | Equipped Products | ||
1,092,548 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 40A | 1.6 | EPDM | Equipped Products | ||
1,092,548 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 40A | 1.6 | NBR | Equipped Products | ||
1,172,801 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 50A | 1.6 | EPDM | Equipped Products | ||
1,172,801 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 50A | 1.6 | NBR | Equipped Products | ||
1,529,607 IDR | 1 Piece(s) | 15 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 65A | 1.6 | EPDM | Equipped Products | ||
1,529,607 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 65A | 1.6 | NBR | Equipped Products | ||
1,653,407 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 80A | 1.6 | EPDM | Equipped Products | ||
1,653,407 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 80A | 1.6 | NBR | Equipped Products | ||
1,835,344 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 100A | 1.6 | EPDM | Equipped Products | ||
1,835,344 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 100A | 1.6 | NBR | Equipped Products | ||
2,855,149 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 125A | 1.6 | EPDM | Equipped Products | ||
2,855,149 IDR | 1 Piece(s) | 14 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 125A | 1.6 | NBR | Equipped Products | ||
3,641,492 IDR | 1 Piece(s) | 15 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 150A | 1.3 | EPDM | Equipped Products | ||
3,641,492 IDR | 1 Piece(s) | 15 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 150A | 1.3 | NBR | Equipped Products | ||
7,312,154 IDR | 1 Piece(s) | 15 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Chemical | 200A | 1.0 | EPDM | Equipped Products | ||
7,312,154 IDR | 1 Piece(s) | 15 Day(s) or more | Steel pipe / Stainless Steel Pipe / PVC Pipe | Water / Air / Organic Gas / Oils and Fats | 200A | 1.0 | NBR | Equipped Products |
Loading...
Type | Joint | Casing Material | SUS316 | Tightening Bolt Type | Hexagon socket head bolt |
---|
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Kebijakan Privacy
Thank you for your cooperation.Terima kasih atas kerjasama anda.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Silahkan pergunakan Forms Permintaan.
Kebijakan Privacy