(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Punches(Surface treatment:RW coating)

Days to Ship
  • All
  • 3 Day(s) or Less
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 15 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Shank type
Tip shape
Jector
Material
Heavy-load punches
Shank (mounting part) shape
Surface treatment

    Shoulder Punches  RW Coating

      Double-Stepped Shoulder Punches, RW Coating

      Brand

      MISUMI

      MISUMI

      Product Series

      Shoulder Punches RW Coating

      Double-Stepped Shoulder Punches, RW Coating

      CAD
      • 2D / 3D
      • 2D / 3D
      Days to Ship 11 Day(s) or more 11 Day(s) or more
      Shank typeSingle-steppedDouble-stepped
      Tip shapeA / D / R / E / GA / D / R / E / G
      JectorNoneNone
      MaterialSKH51 Equivalent / Powdered high-speed steelSKH51 Equivalent / Powdered high-speed steel
      Heavy-load punchesNoNo
      Shank (mounting part) shapeStandardStandard
      Surface treatmentRW coatingRW coating

      Loading...

      1. 1

      Related Categories to Punches