(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

SYOWA CP Metal Fittings for Hung Plumbing(Material:PP (Polypropylene))

Days to Ship
  • All
  • 8 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 14 Day(s) or Less
  • 15 Day(s) or Less
  • 16 Day(s) or Less
  • 17 Day(s) or Less
  • 18 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Type
Main Applicable Tube O.D.(mm)
Material
Applicable Tube Type
Surface Treatment

    Plastic Band, JB Plastic Band

      Plastic Band, JBT, Plastic Hanging Band

      Brand

      SYOWA CP

      SYOWA CP

      Product Series

      Plastic Band, JB Plastic Band

      Plastic Band, JBT, Plastic Hanging Band

      Days to Ship 12 Day(s) or more 12 Day(s) or more
      TypeSuspended BandsSuspended Bands
      Main Applicable Tube O.D.(mm)10 ~ Less than 20 ~ 100 ~ Less than 20010 ~ Less than 20 ~ 60 ~ Less than 70
      MaterialPP (Polypropylene)PP (Polypropylene)
      Applicable Tube TypeSteel Tube / Vinyl Chloride TubesCast Iron Pipes / Copper Pipes / Copper-coated Tubes / Vinyl Chloride Tubes
      Surface TreatmentN/AN/A

      Loading...

      1. 1

      Related Categories to Metal Fittings for Hung Plumbing