(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

SHINOHARA ELECTRIC Packing

Days to Ship
  • All
  • Same day
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 16 Day(s) or Less
  • 17 Day(s) or Less
  • 18 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Material
Dimension: Thickness/Depth(mm)

    Inset Packing

      Straight Packing

        H-Shaped Rubber Packing

          Groove Rubber

            Edging (Cable Protection Packing)

              Sponge Packing (D / SD / SS Sponge)

              Brand

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              Product Series

              Inset Packing

              Straight Packing

              H-Shaped Rubber Packing

              Groove Rubber

              Edging (Cable Protection Packing)【50 Pieces Per Package】

              Sponge Packing (D / SD / SS Sponge)【1-5 Pieces Per Package】

              CAD
              • 2D
              • 2D
              Days to Ship 8 Day(s) or more 8 Day(s) or more 8 Day(s) or more 8 Day(s) or more 8 Day(s) or more 8 Day(s) or more
              MaterialChloroprene Rubber / EPDMNatural Rubber + Chloroprene Rubber CoatingPVCEPDM / PVC-Chloroprene Rubber
              Dimension: Thickness/Depth(mm)11.5 ~ 33.53 ~ 514 ~ 206 ~ 83.3 ~ 5.33 ~ 5

              Loading...

              1. 1

              Related Categories to Packing