(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

COSMOTEC Current Feedthrough, Lead-in Terminals(Type of Related Component:Insulating Flange)

Days to Ship
  • All
  • 8 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 14 Day(s) or Less
  • 17 Day(s) or Less
  • 18 Day(s) or Less
  • 21 Day(s) or Less
  • 22 Day(s) or Less
  • 25 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Type
Number of Terminals
Voltage (AC)(kV)
Voltage (DC)(kV)
Current (MAX)(A)
Electrode Material
Flange Standard
Flange Material
Flange Size (Nominal)
Operating Temperature Range (MIN ~ MAX)(℃)
Type of Related Component

    Insulation flange insulator

    Brand

    COSMOTEC

    Product Series

    Insulation flange insulator

    Days to Ship 14 Day(s) or more
    TypeRelated Components
    Number of Terminals-
    Voltage (AC)(kV)-
    Voltage (DC)(kV)-
    Current (MAX)(A)-
    Electrode Material-
    Flange Standard-
    Flange Material-
    Flange Size (Nominal)-
    Operating Temperature Range (MIN ~ MAX)(℃)-
    Type of Related ComponentInsulating Flange

    Loading...

    1. 1

    Related Categories to Current Feedthrough, Lead-in Terminals