(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 8:00 23/2/2025 sampai dengan 6:00 pada tanggal 24/2. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 23/2 to 6:00 (WIB) 24/2/2025. We apologize for the inconvenience.
  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

HITACHIVALVE Strainers(Supply Side, Connection Type:Flange)

Days to Ship
  • All
  • Same day
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 14 Day(s) or Less
  • 15 Day(s) or Less
  • 16 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Supply Side, Plumbing Thread Nominal
Applicable Fluid
Supply Side, Connection Type
Shape
Material
Supply Side, Tube Flange Nominal
Control Side, Connection Type
Control Side, Plumbing Thread Nominal
Control Side, Tube Flange Nominal
Max. Operating Pressure(MPa)

    Strainer, Malleable Valve, 10K Type, Flanged

      Strainer, Malleable Valve, 20K Type, Flanged

      Brand

      HITACHIVALVE

      HITACHIVALVE

      Product Series

      Strainer, Malleable Valve, 10K Type, Flanged

      Strainer, Malleable Valve, 20K Type, Flanged

      CAD
      • 2D
      • 2D
      Days to Ship 10 Day(s) or more 11 Day(s) or more
      Supply Side, Plumbing Thread Nominal--
      Applicable FluidWater / Air / OilWater / Air / Oil
      Supply Side, Connection TypeFlangeFlange
      ShapeY TypeY Type
      MaterialDuctile Cast IronDuctile Cast Iron
      Supply Side, Tube Flange Nominal1 1/4B ~ 2 1/2B1B ~ 3/4B
      Control Side, Connection TypeFlangeFlange
      Control Side, Plumbing Thread Nominal--
      Control Side, Tube Flange Nominal1 1/4B ~ 2 1/2B1B ~ 3/4B
      Max. Operating Pressure(MPa)-2.75

      Loading...

      1. 1

      Related Categories to Strainers