(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

HASEGAWA KOGYO Scaffold Planks(Product Model:Temporary Scaffold Planks)

Days to Ship
  • All
  • 1 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 11 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Product Model
Overall Length(mm)
Maximum Operating Mass(kg)
Applicable Pipe Diameter(mm)
Others

    Scaffold Plank AD Al Stage (One Side Use Type)

      Scaffold Board All Stage (Wide and Heavy Type)

      Brand

      HASEGAWA KOGYO

      HASEGAWA KOGYO

      Product Series

      Scaffold Plank AD Al Stage (One Side Use Type)

      Scaffold Board All Stage (Wide and Heavy Type)

      Days to Ship 8 Day(s) or more 8 Day(s) or more
      Product ModelTemporary Scaffold PlanksTemporary Scaffold Planks
      Overall Length(mm)2000 ~ 40004000
      Maximum Operating Mass(kg)120240
      Applicable Pipe Diameter(mm)--
      Others--

      Loading...

      1. 1

      Related Categories to Scaffold Planks