(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Switch Boxes(Material:Other)

Days to Ship
  • All
  • Same day
  • 1 Day(s) or Less
  • 8 Day(s) or Less
  • 9 Day(s) or Less
  • 10 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 16 Day(s) or Less
  • 20 Day(s) or Less
  • 25 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Material
Dimension width W(mm)
Dimension vertical H(mm)
Dimension depth D(mm)
Protection function (environmentally resistant)
Intermediate plate
Installation
Representative Standard

    PCS・PCS Series Plastic Box

    Brand

    NITTO KOGYO

    Product Series

    PCS・PCS Series Plastic Box

    CAD
    • 2D
    Days to Ship 1 Day(s) or more
    MaterialOther
    Dimension width W(mm)80
    Dimension vertical H(mm)110 ~ 230
    Dimension depth D(mm)65
    Protection function (environmentally resistant)IP66/67F
    Intermediate plateWithout Circuit Board
    InstallationOutdoors
    Representative Standard-

    Loading...

    1. 1

    Related Categories to Switch Boxes