(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

UDCMX 2-flute for machining cemented carbide and hard brittle materials (Part Numbers)

UDCMX 2-flute for machining cemented carbide and hard brittle materials

[Features]
· The newly developed diamond coating and X-thinning enable high efficiency drilling in carbide alloys.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
UDCMX2040-040
UDCMX2050-050
UDCMX2060-060
UDCMX2070-070
UDCMX2080-080
UDCMX2090-090
UDCMX2100-100
UDCMX2110-100
UDCMX2120-100
UDCMX2130-100
UDCMX2140-100
UDCMX2150-100
UDCMX2160-100
UDCMX2200-100
UDCMX2210-100
UDCMX2250-100
UDCMX2300-100
UDCMX2330-120
UDCMX2350-120
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipHole diameter (drill diameter) D
(mm)
Groove Length L
(mm)
Overall Length L
(mm)
Coating Type JAN Code Trusco Code Drill diameter (Blade diameter)
(mm)
Single Item / Set Item Tip angle
(°)
Diameter Tolerance
(mm)
Thinning Groove length
(mm)
Overall length
(mm)
Shank diameter / MT no Work Material Tool Material Shank type Coating / Surface Treatment JAN code Trusco code Tool Material (Details) Coating / Surface Treatment (Details) Work material (Details) Helix angle
(°)
Shank Diameter Tolerance
(mm)

2,471,980 IDR

1 Piece(s) 9 Day(s) or more 0.4438Other4560295080683468-3641-------------------

2,471,980 IDR

1 Piece(s) 9 Day(s) or more 0.5538Other4560295080690468-3650-------------------

2,471,980 IDR

1 Piece(s) 9 Day(s) or more 0.6638Other4560295080706468-3668-------------------

2,471,980 IDR

1 Piece(s) 11 Day(s) or more 0.7738Other4560295080713468-3676-------------------

2,471,980 IDR

1 Piece(s) 9 Day(s) or more 0.8838Other4560295080720468-3684-------------------

2,471,980 IDR

1 Piece(s) 11 Day(s) or more 0.9938Other4560295080737468-3692-------------------

2,000,204 IDR

1 Piece(s) 9 Day(s) or more 11038Other4560295080744468-3706-------------------

2,382,284 IDR

1 Piece(s) 9 Day(s) or more ------1.1Single unit1300/-0.02X type10383ResinCarbideEnd mill shankFor Non-Ferrous (Diamond coat)4560295088405698-5777Fine particle cemented carbideUDCMachinable ceramic/glass-filled resin/carbide alloy30-0.005/0

2,382,284 IDR

1 Piece(s) 8 Day(s) or more ------1.2Single unit1300/-0.02X type10383ResinCarbideEnd mill shankFor Non-Ferrous (Diamond coat)4560295088412698-5785Fine particle cemented carbideUDCMachinable ceramic/glass-filled resin/carbide alloy30-0.005/0

2,382,284 IDR

1 Piece(s) 8 Day(s) or more ------1.3Single unit1300/-0.02X type10383ResinCarbideEnd mill shankFor Non-Ferrous (Diamond coat)4560295088429698-5793Fine particle cemented carbideUDCMachinable ceramic/glass-filled resin/carbide alloy30-0.005/0

2,382,284 IDR

1 Piece(s) 9 Day(s) or more ------1.4Single unit1300/-0.02X type10383ResinCarbideEnd mill shankFor Non-Ferrous (Diamond coat)4560295088436698-5807Fine particle cemented carbideUDCMachinable ceramic/glass-filled resin/carbide alloy30-0.005/0

2,553,846 IDR

1 Piece(s) 12 Day(s) 1.51038Other4560295082052485-2885-------------------

2,553,846 IDR

1 Piece(s) 12 Day(s) 1.61038Other4560295082069485-2893-------------------

2,553,846 IDR

1 Piece(s) 12 Day(s) 21038Other4560295082076485-2907-------------------

2,553,846 IDR

1 Piece(s) 12 Day(s) 2.11038Other4560295082083485-2915-------------------

2,553,846 IDR

1 Piece(s) 12 Day(s) 2.51038Other4560295082090485-2923-------------------

2,553,846 IDR

1 Piece(s) 12 Day(s) 31038Other4560295082359485-2931-------------------

2,832,308 IDR

1 Piece(s) 12 Day(s) 3.31250Other4560295082366485-2940-------------------

2,832,308 IDR

1 Piece(s) 12 Day(s) 3.51250Other4560295082373485-2958-------------------

Loading...

  1. 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)