(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Staggered Blade Side Cutter SS (SSV250X320)

Staggered Blade Side Cutter SS SSV250X320

Available in a wide range of outer diameters and thickness. Ideal for heavy duty cutting. Uses MCo material (cobalt high speed steel).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

SSV250X320

 
Part Number
SSV250X320
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipOuter Diameter
(mm)
Thickness
(mm)
Hole Diameter
(mm)
Number of flutes
(sheet)
Thickness Tolerance
(mm)

43,116,733 IDR

1 Piece(s) 12 Day(s) or more 2503231.75300~+0.160

Loading...

  1. 1

Basic Information

Material MCO work material Steel / Cast Iron / Stainless Steel / Aluminum / Copper Alloys O.D. Tolerance(mm) 0~+1
Hole Dia. Tolerance(mm) H7 Torsional Angle(°) Right and Left 15

Please check the type/dimensions/specifications of the part SSV250X320 in the Staggered Blade Side Cutter SS series.

Products like this...

Part Number
SST075X030
SST075X035
SST075X040
SST075X045
SST075X050
SST075X055
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipOuter Diameter
(mm)
Thickness
(mm)
Hole Diameter
(mm)
Number of flutes
(sheet)
Thickness Tolerance
(mm)

1,708,949 IDR

1 Piece(s) 8 Day(s) or more 75325.4180~+0.060

1,708,949 IDR

1 Piece(s) 12 Day(s) or more 753.525.4180~+0.075

1,570,923 IDR

1 Piece(s) 8 Day(s) or more 75425.4180~+0.075

1,390,428 IDR

1 Piece(s) 12 Day(s) or more 754.525.4180~+0.075

1,390,428 IDR

1 Piece(s) 12 Day(s) 75525.4180~+0.075

1,347,958 IDR

1 Piece(s) 12 Day(s) or more 755.525.4180~+0.075

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)