(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Twisted Pair Instrumentation Cable

Twisted Pair Instrumentation Cable

Twisted pair Instrumentation cable TKVVBS series

[Features]
· Superior heat resistance, oil resistance, and flexibility.
· Twisted layer types and twisted pair types are available.
· Because a twisted pair type is set at a different pitch to adjacent pairs, crosstalk noise can be reduced.
· A braided shield is provided as a noise countermeasure.
· Shield wiring work can be performed easily thanks to a drain wire of the same size as the conductor.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
TKVVBS-0.2SQ-1P-1
TKVVBS-0.2SQ-1P-2
TKVVBS-0.2SQ-1P-3
TKVVBS-0.2SQ-1P-4
TKVVBS-0.2SQ-1P-5
TKVVBS-0.2SQ-1P-6
TKVVBS-0.2SQ-1P-7
TKVVBS-0.2SQ-1P-8
TKVVBS-0.2SQ-1P-9
TKVVBS-0.2SQ-1P-10
TKVVBS-0.2SQ-1P-11
TKVVBS-0.2SQ-1P-12
TKVVBS-0.2SQ-1P-13
TKVVBS-0.2SQ-1P-14
TKVVBS-0.2SQ-1P-15
TKVVBS-0.2SQ-1P-16
TKVVBS-0.2SQ-1P-17
TKVVBS-0.2SQ-1P-18
TKVVBS-0.2SQ-1P-19
TKVVBS-0.2SQ-1P-20
TKVVBS-0.2SQ-1P-21
TKVVBS-0.2SQ-1P-22
TKVVBS-0.2SQ-1P-23
TKVVBS-0.2SQ-1P-24
TKVVBS-0.2SQ-1P-25
TKVVBS-0.2SQ-1P-26
TKVVBS-0.2SQ-1P-27
TKVVBS-0.2SQ-1P-28
TKVVBS-0.2SQ-1P-29
TKVVBS-0.2SQ-1P-30
TKVVBS-0.2SQ-1P-31
TKVVBS-0.2SQ-1P-32
TKVVBS-0.2SQ-1P-33
TKVVBS-0.2SQ-1P-34
TKVVBS-0.2SQ-1P-35
TKVVBS-0.2SQ-1P-36
TKVVBS-0.2SQ-1P-37
TKVVBS-0.2SQ-1P-38
TKVVBS-0.2SQ-1P-39
TKVVBS-0.2SQ-1P-40
TKVVBS-0.2SQ-1P-41
TKVVBS-0.2SQ-1P-42
TKVVBS-0.2SQ-1P-43
TKVVBS-0.2SQ-1P-44
TKVVBS-0.2SQ-1P-45
TKVVBS-0.2SQ-1P-46
TKVVBS-0.2SQ-1P-47
TKVVBS-0.2SQ-1P-48
TKVVBS-0.2SQ-1P-49
TKVVBS-0.2SQ-1P-50
TKVVBS-0.2SQ-1P-51
TKVVBS-0.2SQ-1P-52
TKVVBS-0.2SQ-1P-53
TKVVBS-0.2SQ-1P-54
TKVVBS-0.2SQ-1P-55
TKVVBS-0.2SQ-1P-56
TKVVBS-0.2SQ-1P-57
TKVVBS-0.2SQ-1P-58
TKVVBS-0.2SQ-1P-59
TKVVBS-0.2SQ-1P-60
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipOverall Length
(m)
Conductor Cross Section
(mm2)
AWG size
(AWG)
Number Of Cores
(Core)
Logarithm Finished outer diameter
(mm)
Rated Voltage Representative Standard Grounding Wire Internal conductor configuration (number of strands/strand diameter)
(Units/mm)
Internal conductor outer diameter
(mm)
Insulation body outer diameter
(mm)

81,974 IDR

1 Piece(s) 8 Day(s) or more 10.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

110,000 IDR

1 Piece(s) 8 Day(s) or more 20.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

165,000 IDR

1 Piece(s) 8 Day(s) or more 30.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

220,000 IDR

1 Piece(s) 8 Day(s) or more 40.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

275,000 IDR

1 Piece(s) 8 Day(s) or more 50.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

330,000 IDR

1 Piece(s) 8 Day(s) or more 60.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

385,000 IDR

1 Piece(s) 8 Day(s) or more 70.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

440,000 IDR

1 Piece(s) 8 Day(s) or more 80.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

495,000 IDR

1 Piece(s) 8 Day(s) or more 90.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

291,333 IDR

1 Piece(s) 8 Day(s) or more 100.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

320,500 IDR

1 Piece(s) 8 Day(s) or more 110.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

349,667 IDR

1 Piece(s) 8 Day(s) or more 120.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

378,833 IDR

1 Piece(s) 8 Day(s) or more 130.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

408,000 IDR

1 Piece(s) 8 Day(s) or more 140.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

437,000 IDR

1 Piece(s) 8 Day(s) or more 150.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

466,167 IDR

1 Piece(s) 8 Day(s) or more 160.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

495,333 IDR

1 Piece(s) 8 Day(s) or more 170.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

524,500 IDR

1 Piece(s) 8 Day(s) or more 180.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

553,667 IDR

1 Piece(s) 8 Day(s) or more 190.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

582,833 IDR

1 Piece(s) 8 Day(s) or more 200.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

612,000 IDR

1 Piece(s) 8 Day(s) or more 210.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

641,000 IDR

1 Piece(s) 8 Day(s) or more 220.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

670,167 IDR

1 Piece(s) 8 Day(s) or more 230.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

699,167 IDR

1 Piece(s) 8 Day(s) or more 240.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

728,333 IDR

1 Piece(s) 8 Day(s) or more 250.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

757,500 IDR

1 Piece(s) 8 Day(s) or more 260.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

786,667 IDR

1 Piece(s) 8 Day(s) or more 270.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

815,833 IDR

1 Piece(s) 8 Day(s) or more 280.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

845,000 IDR

1 Piece(s) 8 Day(s) or more 290.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

874,167 IDR

1 Piece(s) 8 Day(s) or more 300.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

903,333 IDR

1 Piece(s) 8 Day(s) or more 310.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

932,500 IDR

1 Piece(s) 8 Day(s) or more 320.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

961,667 IDR

1 Piece(s) 8 Day(s) or more 330.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

990,667 IDR

1 Piece(s) 8 Day(s) or more 340.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,019,833 IDR

1 Piece(s) 8 Day(s) or more 350.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,048,833 IDR

1 Piece(s) 8 Day(s) or more 360.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,078,000 IDR

1 Piece(s) 8 Day(s) or more 370.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,107,167 IDR

1 Piece(s) 8 Day(s) or more 380.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,136,333 IDR

1 Piece(s) 8 Day(s) or more 390.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,165,500 IDR

1 Piece(s) 8 Day(s) or more 400.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,194,667 IDR

1 Piece(s) 8 Day(s) or more 410.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,223,833 IDR

1 Piece(s) 8 Day(s) or more 420.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,252,833 IDR

1 Piece(s) 8 Day(s) or more 430.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,282,000 IDR

1 Piece(s) 8 Day(s) or more 440.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,311,167 IDR

1 Piece(s) 8 Day(s) or more 450.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,340,333 IDR

1 Piece(s) 8 Day(s) or more 460.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,369,500 IDR

1 Piece(s) 8 Day(s) or more 470.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,398,667 IDR

1 Piece(s) 8 Day(s) or more 480.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,427,833 IDR

1 Piece(s) 8 Day(s) or more 490.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,407,833 IDR

1 Piece(s) 8 Day(s) or more 500.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,435,833 IDR

1 Piece(s) 8 Day(s) or more 510.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,464,167 IDR

1 Piece(s) 8 Day(s) or more 520.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,492,167 IDR

1 Piece(s) 8 Day(s) or more 530.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,520,333 IDR

1 Piece(s) 8 Day(s) or more 540.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,548,500 IDR

1 Piece(s) 8 Day(s) or more 550.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,576,667 IDR

1 Piece(s) 8 Day(s) or more 560.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,604,833 IDR

1 Piece(s) 8 Day(s) or more 570.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,633,000 IDR

1 Piece(s) 8 Day(s) or more 580.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,661,167 IDR

1 Piece(s) 8 Day(s) or more 590.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

1,689,167 IDR

1 Piece(s) 8 Day(s) or more 600.22421P4.6[Other] 150VUL / CSA(c-UL)[Other] Drain wire7/0.180.541.04

Loading...

Basic Information

Shield Available Properties Oil Resistance / Heat-Resistance Sheath (outer coating) color Gray
Sheath (outer coating) material PVC (Polyvinyl Chloride) Insulation body materials PVC (Polyvinyl Chloride) Insulation body color See the catalog

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)