(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 6:00 2/3/2025 sampai dengan 5:00 pada tanggal 3/3. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 6:00 2/3 to 5:00 (WIB) 3/3/2025. We apologize for the inconvenience.
  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

3-Color Display, Digital Seating Switch ISA3/ISA3-L Series Components (ISA-19-2)

3-Color Display, Digital Seating Switch ISA3/ISA3-L Series Components ISA-19-2

3-color Display Digital Seating Switch ISA3/ISA3-L Series components such as connecting screws and seal for additional stations.

(i)Caution

  • Refer to the manufacturer's catalog for specification and material details.
  • Product images may be representative images only. Please refer to the manufacturer's catalog for shape details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

ISA-19-2

 
Part Number
ISA-19-2
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNumber of stations Piping specifications Type

-

1 Piece(s) 15 Day(s) 2 stations-Centralized lead wire (For 1 output)

Loading...

  1. 1

Please check the type/dimensions/specifications of the part ISA-19-2 in the 3-Color Display, Digital Seating Switch ISA3/ISA3-L Series Components series.

Products like this...

Part Number
ISA-16-4
ISA-16-5
ISA-16-6
ISA-19-3
ISA-19-4
ISA-19-5
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNumber of stations Piping specifications Type

357,105 IDR

1 Piece(s) 20 Day(s) 4 stations-Connecting screw

-

1 Piece(s) 15 Day(s) 5 stations-Connecting screw

-

1 Piece(s) 15 Day(s) 6 stations-Connecting screw

-

1 Piece(s) 15 Day(s) Triple-Centralized lead wire (For 1 output)

-

1 Piece(s) 15 Day(s) 4 stations-Centralized lead wire (For 1 output)

-

1 Piece(s) 15 Day(s) 5 stations-Centralized lead wire (For 1 output)

Tech Support