(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
This translation is a Google translation Terjemahan ini adalah terjemahan Google
[Specifications]
Short-stroke cylinders are ideal for clamping tasks with short strokes, e.g. in machining jigs.• Rapid response when pressure is applied
• Large clamping forces in comparison to their size
• Minimal installation space
• Integrated sensor slots for contacting or contactless proximity sensors
• Hole pattern for mounting as per VDMA 24562 for 32 to 100 mm diameter
Piston diameter | 4 | 6 | 10 | 12 | 16 | 20 | 25 | 32 | 40 | 50 | 63 | 80 | 100 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Pneumatic connection | M3 | M3 | M5 | M5 | M5 | M5 | M5 | G1/8 | G1/8 | G1/8 | G1/8 | G1/8 | G1/4 |
Piston rod with female thread | - | - | - | O | O | O | O | O | O | O | O | O | O |
Piston rod with male thread | O | O | O | O | O | O | O | O | O | O | O | O | O |
Piston rod without thread | O | O | O | O | - | - | - | - | - | - | - | - | - |
Operating medium | Compressed air to ISO 8573-1:2010 [7:4:4] | ||||||||||||
Note on operating/ pilot medium | Lubricated operation possible (in which case lubricated operation will always be required) | ||||||||||||
Design | Piston | ||||||||||||
Piston rod | |||||||||||||
Cushioning | Elastic cushioning rings/pads at both ends | ||||||||||||
Type of mounting | Via through-hole | Via through-hole | |||||||||||
- | Via accessories | ||||||||||||
Mounting position | Any | ||||||||||||
Operating pressure [bar] | 2 to 8 | 1.5 to 8 | 1 to 8 | 1 to 10 | 0.6 to 10 | ||||||||
Ambient temperature [℃] | -20 to +80 | ||||||||||||
Corrosion resistance class CRC | 1 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Cylinder Operation Method | Stroke: L (mm) | Operating Pressure (MPa) | Seals material | Piston rod material | Piston diameter (mm) | Theoretical force at 6 bar, retracting (N) | Theoretical force at 6 bar, advancing (N) | Pneumatic connection | Moving mass (g) | Mode of operation | Manufacturer part # | Weight |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1,644,665 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 46 | Double Acting | 188219 | 280 | ||
1,644,665 IDR | 1 Piece(s) | 15 Day(s) | - | - | - | - | - | - | - | - | - | - | - | - | - | ||
1,875,460 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 50 | Double Acting | 188204 | 320 | ||
1,704,122 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 51 | Double Acting | 188220 | 300 | ||
1,935,557 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 55 | Double Acting | 188215 | 340 | ||
1,704,122 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 51 | Double Acting | 188210 | 300 | ||
1,935,557 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 55 | Double Acting | 188205 | 340 | ||
1,763,260 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 56 | Double Acting | 188221 | 320 | ||
1,994,695 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 60 | Double Acting | 188216 | 360 | ||
1,822,717 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 61 | Double Acting | 188222 | 340 | ||
2,054,153 IDR | 1 Piece(s) | 15 Day(s) | Double Acting | 20 | 0.1~1 | TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 65 | - | 188217 | 380 | ||
2,054,153 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 65 | Double Acting | 188207 | 380 | ||
1,882,493 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 66 | Double Acting | 188223 | 360 | ||
2,113,610 IDR | 1 Piece(s) | 15 Day(s) | Double Acting | 25 | 0.1~1 | TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 70 | - | 188218 | 400 | ||
1,882,493 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 66 | Double Acting | 188213 | 360 | ||
2,113,610 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 32 | 415 | 483 | G1/8 | 70 | Double Acting | 188208 | 400 | ||
2,200,559 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 69 | Double Acting | 188247 | 350 | ||
2,457,566 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 66 | Double Acting | 188242 | 460 | ||
2,200,559 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 69 | Double Acting | 188237 | 350 | ||
2,457,566 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 66 | Double Acting | 188232 | 460 | ||
2,268,327 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 74 | Double Acting | 188248 | 380 | ||
2,525,016 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 71 | Double Acting | 188243 | 490 | ||
2,268,327 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 74 | Double Acting | 188238 | 380 | ||
2,525,016 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 71 | Double Acting | 188233 | 490 | ||
2,336,095 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 79 | Double Acting | 188249 | 610 | ||
2,593,104 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 76 | Double Acting | 188244 | 520 | ||
2,336,095 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 79 | Double Acting | 188239 | 610 | ||
2,593,104 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 76 | Double Acting | 188234 | 520 | ||
2,403,544 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 84 | Double Acting | 188250 | 640 | ||
2,660,233 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 81 | Double Acting | 188245 | 550 | ||
2,403,544 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 84 | Double Acting | 188240 | 640 | ||
2,660,233 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 81 | Double Acting | 188235 | 550 | ||
2,470,992 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 89 | Double Acting | 188251 | 670 | ||
2,728,001 IDR | 1 Piece(s) | 4 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 86 | Double Acting | 188246 | 580 | ||
2,470,992 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 89 | Double Acting | 188241 | 670 | ||
2,728,001 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.1~1 | TPE-U(PU) | High-alloy steel | 40 | 686 | 754 | G1/8 | 86 | Double Acting | 188236 | 580 | ||
2,792,255 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 119 | Double Acting | 188272 | 435 | ||
3,079,311 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 107 | Double Acting | 188268 | 595 | ||
2,792,255 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 119 | Double Acting | 188264 | 435 | ||
3,079,311 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 107 | Double Acting | 188260 | 595 | ||
2,869,293 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 127 | Double Acting | 188273 | 470 | ||
3,156,350 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 115 | Double Acting | 188269 | 630 | ||
2,869,293 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 127 | Double Acting | 188265 | 470 | ||
3,156,350 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 115 | Double Acting | 188261 | 630 | ||
2,946,332 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 135 | Double Acting | 188274 | 505 | ||
3,233,070 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 123 | Double Acting | 188270 | 665 | ||
2,946,332 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 135 | Double Acting | 188266 | 505 | ||
3,233,070 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 123 | Double Acting | 188262 | 665 | ||
3,023,370 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 143 | Double Acting | 188275 | 540 | ||
3,310,108 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 131 | Double Acting | 188271 | 700 | ||
3,023,370 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 143 | Double Acting | 188267 | 540 | ||
3,310,108 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 50 | 1057 | 1178 | G1/8 | 131 | Double Acting | 188263 | 700 | ||
3,518,529 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 170 | Double Acting | 188296 | 550 | ||
3,855,453 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 150 | Double Acting | 188292 | 660 | ||
3,518,529 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 170 | Double Acting | 188288 | 550 | ||
3,855,453 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 150 | Double Acting | 188284 | 660 | ||
3,604,199 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 178 | Double Acting | 188297 | 600 | ||
3,941,122 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 158 | Double Acting | 188293 | 710 | ||
3,604,199 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 178 | Double Acting | 188289 | 600 | ||
3,941,122 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 158 | Double Acting | 188285 | 710 | ||
3,689,868 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 186 | Double Acting | 188298 | 650 | ||
4,027,111 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 166 | Double Acting | 188294 | 760 | ||
3,689,868 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 186 | Double Acting | 188290 | 650 | ||
4,027,111 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 166 | Double Acting | 188286 | 760 | ||
3,775,538 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 194 | Double Acting | 188299 | 700 | ||
4,112,781 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 174 | Double Acting | 188295 | 810 | ||
3,775,538 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | NBR, TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 194 | Double Acting | 188291 | 700 | ||
4,112,781 IDR | 1 Piece(s) | 15 Day(s) | - | - | 0.06~1 | TPE-U(PU) | High-alloy steel | 63 | 1750 | 1870 | G1/8 | 174 | Double Acting | 188287 | 810 | ||
4,744,116 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 327 | Double Acting | 188320 | 1052 | ||
5,187,168 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 277 | Double Acting | 188316 | 1176 | ||
4,744,116 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 327 | Double Acting | 188312 | 993 | ||
5,187,168 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 277 | Double Acting | 188308 | 1057 | ||
4,838,096 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 339 | Double Acting | 188321 | 1102 | ||
5,280,830 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 289 | Double Acting | 188317 | 1233 | ||
4,838,096 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 339 | Double Acting | 188313 | 1099 | ||
5,280,830 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 289 | Double Acting | 188309 | 1180 | ||
4,931,758 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 351 | Double Acting | 188322 | 1167 | ||
5,374,490 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 301 | Double Acting | 188318 | 1297 | ||
4,931,758 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 351 | Double Acting | 188314 | 1152 | ||
5,374,490 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 301 | Double Acting | 188310 | 1288 | ||
5,025,419 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 363 | Double Acting | 188323 | 1219 | ||
5,468,153 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 313 | Double Acting | 188319 | 1348 | ||
5,025,419 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 363 | Double Acting | 188315 | 1158 | ||
5,468,153 IDR | 1 Piece(s) | 20 Day(s) | - | - | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 80 | 2827 | 3016 | G1/8 | 313 | Double Acting | 188311 | 1289 | ||
5,941,573 IDR | 1 Piece(s) | 20 Day(s) | - | 125 | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 100 | 4418 | 4712 | G1/4 | 699 | Double Acting | 188344 | 2079 | ||
6,544,137 IDR | 1 Piece(s) | 20 Day(s) | - | 125 | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 100 | 4418 | 4712 | G1/4 | 535 | Double Acting | 188340 | 2200 | ||
5,941,573 IDR | 1 Piece(s) | 20 Day(s) | - | 160 | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 100 | 4418 | 4712 | G1/4 | 699 | Double Acting | 188336 | 1973 | ||
6,544,137 IDR | 1 Piece(s) | 20 Day(s) | - | 200 | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 100 | 4418 | 4712 | G1/4 | 535 | Double Acting | 188332 | 2006 | ||
6,048,020 IDR | 1 Piece(s) | 20 Day(s) | - | 200 | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 100 | 4418 | 4712 | G1/4 | 719 | Double Acting | 188345 | 2161 | ||
6,650,905 IDR | 1 Piece(s) | 20 Day(s) | - | 250 | 0.1~1 | NBR, TPE-U(PU) | High-alloy steel | 100 | 4418 | 4712 | G1/4 | 555 | Double Acting | 188341 | 2325 |
Loading...
Operating Temperature(°C) | -20::80 | Housing material | Wrought aluminum alloy, Anodized | Cover material | Wrought aluminum alloy, Anodized |
---|---|---|---|---|---|
Operating medium | Compressed air as per ISO 8573-1:2010 [7:4:4] | Corrosion resistance class (CRC) | 1 - Low corrosion stress |
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Kebijakan Privacy
Thank you for your cooperation.Terima kasih atas kerjasama anda.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Silahkan pergunakan Forms Permintaan.
Kebijakan Privacy