(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
This translation is a Google translation Terjemahan ini adalah terjemahan Google
Safe design using self-locking.
Standardized models for a range of applications from 2 kN to 1,250 kN.
● There is a self-locking effect from using a screw jack, which allows maintenance of the screw shaft even during unexpected power cuts.
● The worm reduction section utilizes a grease lubrication method (maintenance free) up to 5 kN to 10 kN, and oil bath lubrication for 2 kN and 25 kN or higher. Can also withstand high speed rotation.
● High performance, with ideal bearing construction. A high level of standardization, from 2 kN to 1,250 kN.
● A track record of up to 2,000 kN.
Japanese Only
Part Number
Configured Part Number is shown.
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | RoHS | Grease | Shaft Diameter (φ) | Table Length L1 (mm) | Table Width W1 (mm) | Drive Method | Table Material | Table Surface Treatment | Stroke (mm) | Screw Shaft Direction | Shaft arrangement | Reduction Ratio | Screw Shaft End Shape | Bellows | With Whirl-Stop |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
26,248,926 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 200 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
23,899,135 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 200 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
20,359,385 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 300 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
22,391,720 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 300 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
27,909,627 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 300 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
31,999,444 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 300 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
20,993,481 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 400 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
23,095,242 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 400 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
28,786,125 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 400 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
25,618,825 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 400 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
21,988,776 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 500 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
24,495,480 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 500 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
29,020,089 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 500 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
26,531,444 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 500 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
18,946,713 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 100 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
21,227,078 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 100 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
25,444,668 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 100 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
23,174,740 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 100 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
19,544,690 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 200 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
21,912,541 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 200 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
26,248,926 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 200 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
23,899,135 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 200 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
20,359,385 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 300 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
22,391,720 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 300 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
27,909,627 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 300 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
24,840,250 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 300 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
20,993,481 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 400 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
23,095,242 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 400 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
28,786,125 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 400 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
25,618,825 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 400 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
21,988,776 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 500 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
24,495,480 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 500 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
29,020,089 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 500 | Push-up type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
26,531,444 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 30 | 150 | 96 | - | - | - | 500 | Push-up type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
24,533,148 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
26,652,971 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
31,409,546 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
28,925,712 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
25,331,781 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
27,505,783 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
32,414,462 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
29,843,141 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
26,566,665 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
28,203,679 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
32,715,039 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
30,760,569 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
27,419,478 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
29,100,236 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
33,756,075 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
31,732,178 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
28,788,407 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 500 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
29,790,509 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 500 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
34,562,331 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 500 | Lifting type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
32,378,707 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 500 | Lifting type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
24,533,148 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
26,652,971 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
31,409,546 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
28,925,712 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
25,331,781 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
27,505,783 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
32,414,462 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
29,843,141 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
26,566,665 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
28,203,679 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
32,715,039 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
30,760,569 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
27,419,478 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
29,100,236 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
33,756,075 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
31,732,178 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
28,788,407 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 500 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | No screw rotation stopper | ||
29,790,509 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 500 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | No screw rotation stopper | ||
34,562,331 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 500 | Lifting type | C (both sides) | Low operating speed | Screw end | With bellows | With screw rotation stopper | ||
32,378,707 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 500 | Lifting type | C (both sides) | Low operating speed | Screw end | No bellows | With screw rotation stopper | ||
24,533,148 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
26,652,971 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
31,409,546 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
28,925,712 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 100 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
25,331,781 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
27,505,783 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
32,414,462 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
29,843,141 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 200 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
26,566,665 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
28,203,679 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
32,715,039 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
30,760,569 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 300 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper | ||
27,419,478 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | No screw rotation stopper | ||
29,100,236 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | No screw rotation stopper | ||
33,756,075 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Push-up type | C (both sides) | High operating speed | Screw end | With bellows | With screw rotation stopper | ||
31,732,178 IDR | 1 Piece(s) | 22 Day(s) or more | 10 | Standard | 40 | 195 | 120 | - | - | - | 400 | Push-up type | C (both sides) | High operating speed | Screw end | No bellows | With screw rotation stopper |
Loading...
Main Body / Peripheral Components | Main Body | Precision | Precision Grade | With or Without Motor | No (Built-in by the customer) |
---|---|---|---|---|---|
With or w/o Lubricant Unit | Available |
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Kebijakan Privacy
Thank you for your cooperation.Terima kasih atas kerjasama anda.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Silahkan pergunakan Forms Permintaan.
Kebijakan Privacy