(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Screw-In Malleable Cast Iron Pipe Fitting, Tee

Screw-In Malleable Cast Iron Pipe Fitting, Tee

[Features]
• JFE pipe fittings are produced at cutting-edge facilities with thorough quality control.
• Moreover, ring stamp PL fittings are coat-baked with powder epoxy resin on the inner and outer surfaces, excluding screws, using a special coating method, providing enhanced adhesiveness, corrosion resistance, etc.
• Can be used with a high level of reliability.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
T-B-1
T-B-1/2
T-B-1/4
T-B-1/8
T-B-2
T-B-3
T-B-3/4
T-B-3/8
T-B-4
T-B-5
T-B-6
T-B-11/2
T-B-11/4
T-B-21/2
T-W-1
T-W-1/2
T-W-1/4
T-W-1/8
T-W-2
T-W-3
T-W-3/4
T-W-3/8
T-W-4
T-W-5
T-W-6
T-W-11/2
T-W-11/4
T-W-21/2
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

72,000 IDR

1 Piece(s) 12 Day(s) or more 1B(25A)No

37,000 IDR

1 Piece(s) 12 Day(s) or more 1/2B(15A)No

57,333 IDR

1 Piece(s) 12 Day(s) or more 1/4B(8A)No

57,333 IDR

1 Piece(s) 12 Day(s) or more 1/8B(6A)No

236,167 IDR

1 Piece(s) 12 Day(s) or more 2B(50A)No

2,286,667 IDR

1 Piece(s) 12 Day(s) or more 3B(80A)No

45,000 IDR

1 Piece(s) 12 Day(s) or more 3/4B(20A)No

57,333 IDR

1 Piece(s) 12 Day(s) or more 3/8B(10A)No

2,286,667 IDR

1 Piece(s) 12 Day(s) or more 4B(100A)No

2,286,667 IDR

1 Piece(s) 12 Day(s) or more 5B(125A)No

6,721,194 IDR

1 Piece(s) 18 Day(s) or more 6B(150A)No

151,833 IDR

1 Piece(s) 12 Day(s) or more 1 1/2B(40A)No

122,500 IDR

1 Piece(s) 12 Day(s) or more 1 1/4B(32A)No

2,286,667 IDR

1 Piece(s) 12 Day(s) or more 2 1/2B(65A)No

46,874 IDR

1 Piece(s) 12 Day(s) or more 1B(25A)Zinc Plating

30,221 IDR

1 Piece(s) 12 Day(s) or more 1/2B(15A)Zinc Plating

39,838 IDR

1 Piece(s) 12 Day(s) or more 1/4B(8A)Zinc Plating

39,838 IDR

1 Piece(s) 12 Day(s) or more 1/8B(6A)Zinc Plating

132,167 IDR

1 Piece(s) 12 Day(s) or more 2B(50A)Zinc Plating

2,286,667 IDR

1 Piece(s) 12 Day(s) or more 3B(80A)Zinc Plating

33,974 IDR

1 Piece(s) 12 Day(s) or more 3/4B(20A)Zinc Plating

39,838 IDR

1 Piece(s) 12 Day(s) or more 3/8B(10A)Zinc Plating

2,286,667 IDR

1 Piece(s) 12 Day(s) or more 4B(100A)Zinc Plating

2,286,667 IDR

1 Piece(s) 12 Day(s) or more 5B(125A)Zinc Plating

6,721,194 IDR

1 Piece(s) 18 Day(s) or more 6B(150A)Zinc Plating

85,340 IDR

1 Piece(s) 12 Day(s) or more 1 1/2B(40A)Zinc Plating

71,267 IDR

1 Piece(s) 12 Day(s) or more 1 1/4B(32A)Zinc Plating

2,286,667 IDR

1 Piece(s) 12 Day(s) or more 2 1/2B(65A)Zinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape Tee Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 1 Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)