(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 8:00 23/2/2025 sampai dengan 6:00 pada tanggal 24/2. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 23/2 to 6:00 (WIB) 24/2/2025. We apologize for the inconvenience.
  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

CK Smokeless Weld Saddle Joint Branch Weld Type

CK Smokeless Weld Saddle Joint Branch Weld Type

Saddle used to take out branches in welding.
[Features]
・ In order to improve the welding quality, the zinc plating on the end surface of the weld is cut and removed
・ There is no risk of harmful zinc gas generation because the plating on the weld is removed
・ Work efficiency and welding efficiency are improved and cost can be reduced
・ Saddle that generates less gas and is friendly to workers
・ The plating (white product) on the fitting surface is cadmium less than 0.001% (10 ppm) and lead less than 0.005% (50 ppm) environment-friendly plating
[Materials]
・ S25C or SS400

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
YS2-50X80-B
YS2-50X80-W
YS2-50X100-B
YS2-50X100-W
YS2-50X125-B
YS2-50X125-W
YS2-50X150-B
YS2-50X150-W
YS2-50X200-B
YS2-50X200-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipSurface Treatment Nominal Dia. Main Conduit Nominal Branch Pipe Nominal

439,352 IDR

1 Piece(s) 11 Day(s) or more No2B(50A)3B(80A)2B(50A)

492,018 IDR

1 Piece(s) 11 Day(s) or more Hot Zinc Plating2B(50A)3B(80A)2B(50A)

470,587 IDR

1 Piece(s) 11 Day(s) or more No2B(50A)4B(100A)2B(50A)

553,576 IDR

1 Piece(s) 11 Day(s) or more Hot Zinc Plating2B(50A)4B(100A)2B(50A)

515,273 IDR

1 Piece(s) 11 Day(s) or more No2B(50A)5B(125A)2B(50A)

618,325 IDR

1 Piece(s) 11 Day(s) or more Hot Zinc Plating2B(50A)5B(125A)2B(50A)

560,872 IDR

1 Piece(s) 11 Day(s) or more No2B(50A)6B(150A)2B(50A)

649,560 IDR

1 Piece(s) 11 Day(s) or more Hot Zinc Plating2B(50A)6B(150A)2B(50A)

629,269 IDR

1 Piece(s) 11 Day(s) or more No2B(50A)8B(200A)2B(50A)

683,759 IDR

1 Piece(s) 11 Day(s) or more Hot Zinc Plating2B(50A)8B(200A)2B(50A)

Loading...

  1. 1

Basic Information

Type Plug Welding Type Fitting Shape Union type Multipoint Piping - Branch Pipe Connection Type Plug
Material Stainless Steel

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)