(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 8:00 24/11/2024 sampai dengan 6:00 pada tanggal 25/11/2024. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 24/11/2024 to 6:00 (WIB) 25/11/2024. We apologize for the inconvenience.
  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

CK Fittings - Screw-in Type Malleable Cast Iron Pipe Fitting - Socket with Different Diameters with Band

CK Fittings - Screw-in Type Malleable Cast Iron Pipe Fitting - Socket with Different Diameters with Band

JIS standard (B2301 screw-in type malleable cast iron pipe fittings) correct threaded fittings.
[Features]
·Conforms to JIS standards.
·The appearance is exactly the same as the conventional product.
· Made in Japan.
[Applications]
·Ideal for resizing white piping.

PDF

Part Number

Configured Part Number is shown.

 
Part Number
BRS-20X15-W
BRS-25X15-W
BRS-25X20-W
BRS-32X15-W
BRS-32X20-W
BRS-32X25-W
BRS-40X15-W
BRS-40X20-W
BRS-40X25-W
BRS-40X32-W
BRS-50X15-W
BRS-50X20-W
BRS-50X25-W
BRS-50X32-W
BRS-50X40-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Nominal of Thread M2

83,841 IDR

1 Piece(s) 11 Day(s) or more 3/4B(20A)1/2B(15A)

90,174 IDR

1 Piece(s) 11 Day(s) or more 1B(25A)1/2B(15A)

90,174 IDR

1 Piece(s) 11 Day(s) or more 1B(25A)3/4B(20A)

118,319 IDR

1 Piece(s) 11 Day(s) or more 1 1/4B(32A)1/2B(15A)

111,283 IDR

1 Piece(s) 11 Day(s) or more 1 1/4B(32A)3/4B(20A)

111,283 IDR

1 Piece(s) 11 Day(s) or more 1 1/4B(32A)1B(25A)

141,539 IDR

1 Piece(s) 11 Day(s) or more 1 1/2B(40A)1/2B(15A)

141,539 IDR

1 Piece(s) 11 Day(s) or more 1 1/2B(40A)3/4B(20A)

129,577 IDR

1 Piece(s) 11 Day(s) or more 1 1/2B(40A)1B(25A)

129,577 IDR

1 Piece(s) 11 Day(s) or more 1 1/2B(40A)1 1/4B(32A)

175,313 IDR

1 Piece(s) 11 Day(s) or more 2B(50A)1/2B(15A)

175,313 IDR

1 Piece(s) 11 Day(s) or more 2B(50A)3/4B(20A)

175,313 IDR

1 Piece(s) 11 Day(s) or more 2B(50A)1B(25A)

162,648 IDR

1 Piece(s) 11 Day(s) or more 2B(50A)1 1/4B(32A)

162,648 IDR

1 Piece(s) 11 Day(s) or more 2B(50A)1 1/2B(40A)

Loading...

  1. 1

Basic Information

Connecting Shape Socket Connection Type Screw⇔Screw Different Diameter Material Cast Iron
Connection Thread Type M1 Rc Connection Thread Type M2 Rc Applicable Fluid Water / Air / Gas / Oil
Type Fitting Max. Operating Pressure(MPa) 2.5 Surface Treatment Zinc Plating
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Frequently asked question (FAQ)

Question: Is the white product RoHS compliant?
Answer: It is a RoHS-compliant product. It is a product that complies with environmental regulations, containing no cadmium, lead, and hexavalent chromium.

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)