(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 8:00 19/1/2025 sampai dengan 5:00 pada tanggal 20/1/2025. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 19/1/2025 to 5:00 (WIB) 20/1/2025. We apologize for the inconvenience.
  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

ATOMS CORPORATION FD-L Type Couplings for Repairs

ATOMS CORPORATION FD-L Type Couplings for Repairs

[Features]
·When the tightening bolt is removed, it splits in two. Convenient for repairs in narrow spaces.
·It can easily and quickly handle large-diameter repairs.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
FD-L-15A-EPDM
FD-L-20A-EPDM
FD-L-25A-EPDM
FD-L-32A-EPDM
FD-L-40A-EPDM
FD-L-50A-EPDM
FD-L-65A-EPDM
FD-L-80A-EPDM
FD-L-100A-EPDM
FD-L-125A-EPDM
FD-L-150A-EPDM
FD-L-200A-EPDM
FD-L-250A-EPDM
FD-L-300A-EPDM
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipApplicable Plumbing Nominal Diameter (A)

1,733,333 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe1/2B(15A)

1,733,333 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe3/4B(20A)

1,750,000 IDR

1 Piece(s) 16 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe1B(25A)

1,883,333 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe1 1/4B(32A)

2,016,667 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe1 1/2B(40A)

2,783,333 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe2B(50A)

2,983,333 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe2 1/2B(65A)

4,833,333 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe3B(80A)

5,550,000 IDR

1 Piece(s) 16 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe4B(100A)

7,650,000 IDR

1 Piece(s) 16 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe5B(125A)

9,350,000 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe6B(150A)

17,183,333 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe8B(200A)

18,566,667 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe10B(250A)

19,133,333 IDR

1 Piece(s) 12 Day(s) or more Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe12B(300A)

Loading...

  1. 1

Basic Information

Type Clamp for Repair Applicable Fluid Water Rubber Sealing Material EPDM
Body Material Stainless Steel Tightening Bolt Type Hexagon socket head bolt

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)