(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Disc Spring BD (Iwata Standard)【1-1,000 Pieces Per Package】

Disc Spring BD (Iwata Standard)
  • Volume Discount

[Features]
· A spring for applying pressure. Eliminates bearing vibration and noise while also damping irregular rotations.
· Helps to increase bearing life and markedly simplify design and space.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

Part Number

Configured Part Number is shown.

Part Number
BD-10
BD-13
BD-16
BD-19A
BD-19B
BD-22
BD-24
BD-26
BD-30
BD-32
BD-35A
BD-35B
BD-40
BD-42
BD-47
BD-52
BD-62
BD-80A
BD-80B
BD-85
BD-90A
BD-90B
BD-100A
BD-100B
BD-110A
BD-110B
BD-120A
BD-120B
BD-130A
BD-130B
BD-140A
BD-140B
BD-160A
BD-160B
BD-170A
BD-170B
BD-180A
BD-190A
BD-190B
BD-200A
BD-200B
Part NumberStandard Unit PriceNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountDays to ShipRoHSApplied Load Outer Dia. D
(Ø)
Inner Dia. d
(Ø)
Free Height Ho
(mm)
Plate Thickness t
(mm)
Total deflection amount
(mm)
Sales Unit

6,317 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load1030.40.20.2Box / Package

5,928 IDR

1 Piece(s)Available 9 Day(s) or more 10Used for Light load1340.50.250.25Box / Package

6,414 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load165(4)0.550.250.3Box / Package

3,882,132 IDR

1,000 Pieces Per Package

1 Pack(s) 9 Day(s) or more 10Used for Light load196(5)0.650.30.35Box / Package

6,469 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load1970.70.350.35Box / Package

7,922 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load228(7)0.750.350.4Box / Package

8,087 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load2490.90.40.5Bulk (Purchasing from 1 pc.)

9,562 IDR

1 Piece(s) 9 Day(s) or more 10Used for Light load2690.90.40.5Box / Package

9,086 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load30101.10.40.7Bulk (Purchasing from 1 pc.)

9,677 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load32121.10.40.7Box / Package

10,141 IDR

1 Piece(s) 9 Day(s) or more 10Used for Light load35101.10.40.7Box / Package

991,667 IDR

100 Pieces Per Package

1 Pack(s) 9 Day(s) or more 10Used for Light load35151.20.50.7Box / Package

24,001 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load40171.30.50.8Bulk (Purchasing from 1 pc.)

27,720 IDR

1 Piece(s) 9 Day(s) or more 10Used for Light load42151.40.50.9Box / Package

34,819 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load4720(17)1.50.60.9Bulk (Purchasing from 1 pc.)

38,875 IDR

1 Piece(s) 8 Day(s) or more 10Used for Light load5225(20)1.50.60.9Box / Package

43,439 IDR

1 Piece(s) 9 Day(s) or more 10Used for Light load6230(25)1.80.71.1Bulk (Purchasing from 1 pc.)

412,419 IDR

10 Pieces Per Package

1 Pack(s) 10 Day(s) or more 10Used for Light load80352.30.81.5Box / Package

61,862 IDR

1 Piece(s) 9 Day(s) or more 10Used for Light load80402.30.81.5Box / Package

73,693 IDR

1 Piece(s) 9 Day(s) or more 10Used for Light load85452.50.91.6Bulk (Purchasing from 1 pc.)

123,425 IDR

1 Piece(s)Available 15 Day(s) or more 10Used for Light load90402.50.91.6Box / Package

826,191 IDR

1 Piece(s) 9 Day(s) or more 10Used for Light load90502.50.91.6Box / Package

1,134,490 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 10For Heavy Load100452.611.6Box / Package

170,207 IDR

1 Piece(s) 9 Day(s) or more 10For Heavy Load100552.611.6Bulk (Purchasing from 1 pc.)

1,548,263 IDR

10 Pieces Per Package

1 Pack(s) 10 Day(s) or more 10For Heavy Load110502.71.251.45Box / Package

2,023,539 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 10For Heavy Load110602.71.251.45Box / Package

2,448,236 IDR

20 Pieces Per Package

1 Pack(s) 21 Day(s) or more 10For Heavy Load120552.81.251.55Box / Package

1,857,916 IDR

10 Pieces Per Package

1 Pack(s) 10 Day(s) or more 10For Heavy Load120652.81.251.55Box / Package

2,709,595 IDR

20 Pieces Per Package

1 Pack(s) 21 Day(s) or more 10For Heavy Load130603.21.251.95Box / Package

4,126,900 IDR

20 Pieces Per Package

1 Pack(s) 9 Day(s) or more 10For Heavy Load130753.21.251.95Box / Package

3,379,538 IDR

20 Pieces Per Package

1 Pack(s) 9 Day(s) or more 10For Heavy Load140653.251.252Box / Package

3,342,300 IDR

20 Pieces Per Package

1 Pack(s) 21 Day(s) or more 10For Heavy Load140803.251.252Box / Package

3,561,667 IDR

10 Pieces Per Package

1 Pack(s) 21 Day(s) or more 10For Heavy Load160753.51.52Box / Package

361,204 IDR

1 Piece(s) 9 Day(s) or more 10For Heavy Load160903.51.52Box / Package

4,070,000 IDR

10 Pieces Per Package

1 Pack(s) 15 Day(s) or more 10For Heavy Load170803.81.52.3Box / Package

412,757 IDR

1 Piece(s) 9 Day(s) or more 10For Heavy Load170953.81.52.3Box / Package

6,105,000 IDR

10 Pieces Per Package

1 Pack(s) 21 Day(s) or more 10For Heavy Load180954.222.2Box / Package

6,615,000 IDR

10 Pieces Per Package

1 Pack(s) 21 Day(s) or more 10For Heavy Load190904.322.3Box / Package

6,615,000 IDR

10 Pieces Per Package

1 Pack(s) 21 Day(s) or more 10For Heavy Load1901054.322.3Box / Package

8,140,000 IDR

10 Pieces Per Package

1 Pack(s) 21 Day(s) or more 10For Heavy Load200954.522.5Box / Package

825,514 IDR

1 Piece(s) 9 Day(s) or more 10For Heavy Load2001104.522.5Box / Package

Loading...

  1. 1

Basic Information

Material Spring Steel

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)