(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

D Series Compression Coil Spring (DIN 2098 Standard)【1-20 Pieces Per Package】

D Series  Compression Coil Spring (DIN 2098 Standard)

Click this image to zoom it.

Move the mouse over the image to zoom

  • D Series  Compression Coil Spring (DIN 2098 Standard)
  • D Series  Compression Coil Spring (DIN 2098 Standard)
  • On Sale Till 31/03/2025

Cylindrical compression coil spring following the DIN 2098 standard, popular in Germany.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number
5501
5502
5503
5504
5505
5506
5507
5508
5509
5510
5511
5512
5513
5514
5515
5516
5517
5518
5519
5520
5521
5522
5523
5524
5525
5526
5527
5528
5529
5530
5531
5532
5533
5534
5535
5536
5537
5538
5539
5540
5541
5542
5543
5544
5545
5546
5547
5548
5549
5550
5551
5552
5553
5554
5555
5556
5557
5558
5559
5560
Part NumberStandard Unit PriceNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountDays to ShipRoHSFree Height Hf
(mm)
Coil O.D. OD
(Ø)
Height H2 at Allowable Load
(mm)
Spring Constant k
(N/mm)
Allowable Load (Configurable Range)
(N)
Allowable Load P2
(N)
Material Wire Dia. d
(Ø)
End Surface Status Total Number of Winding N Qty. of Internal Pkg.

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 104.433.511.5648.51~16.0010.388SWP-B0.5Polishing on Both Ends5.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 106.134.77.4198.51~16.0010.388SWP-B0.5Polishing on Both Ends7.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 108.736.54.7928.51~16.0010.388SWP-B0.5Polishing on Both Ends10.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1012393.2638.51~16.0010.388SWP-B0.5Polishing on Both Ends14.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 1017.5312.82.2058.51~16.0010.388SWP-B0.5Polishing on Both Ends20.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 105.53.73.75.5668.51~16.009.996SWP-B0.5Polishing on Both Ends5.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 107.93.75.13.5288.51~16.009.996SWP-B0.5Polishing on Both Ends7.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 14 Day(s) or more 1011.53.77.12.2838.51~16.009.996SWP-B0.5Polishing on Both Ends10.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 14 Day(s) or more 10163.79.81.5588.51~16.009.996SWP-B0.5Polishing on Both Ends14.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 1023.53.7141.0498.51~16.009.996SWP-B0.5Polishing on Both Ends20.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 105.53.83414.01416.01~30.0020.972SWP-B0.63Polishing on Both Ends5.520

234,775 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 107.83.835.48.89816.01~30.0020.972SWP-B0.63Polishing on Both Ends7.520

214,628 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10113.837.55.76216.01~30.0020.972SWP-B0.63Polishing on Both Ends10.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 1015.53.8310.33.9316.01~30.0020.972SWP-B0.63Polishing on Both Ends14.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 1022.53.8314.72.64616.01~30.0020.972SWP-B0.63Polishing on Both Ends20.520

231,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1074.53.72.8328.51~16.009.31SWP-B0.5Polishing on Both Ends5.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10104.55.11.8138.51~16.009.31SWP-B0.5Polishing on Both Ends7.520

231,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10154.57.11.1668.51~16.009.31SWP-B0.5Polishing on Both Ends10.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1021.54.59.80.7948.51~16.009.31SWP-B0.5Polishing on Both Ends14.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 10314.5140.5398.51~16.009.31SWP-B0.5Polishing on Both Ends20.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 106.74.634.37.15416.01~30.0017.15SWP-B0.63Polishing on Both Ends5.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 109.64.635.84.54716.01~30.0017.15SWP-B0.63Polishing on Both Ends7.520

234,775 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10144.638.22.9416.01~30.0017.15SWP-B0.63Polishing on Both Ends10.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 14 Day(s) or more 10204.6311.31.99916.01~30.0017.15SWP-B0.63Polishing on Both Ends14.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 20 Day(s) or more 10294.6316.21.35216.01~30.0017.15SWP-B0.63Polishing on Both Ends20.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 106.94.85.218.52230.01~50.0031.85SWP-B0.8Polishing on Both Ends5.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 109.74.8711.85830.01~50.0031.85SWP-B0.8Polishing on Both Ends7.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10144.89.87.66430.01~50.0031.85SWP-B0.8Polishing on Both Ends10.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 1019.54.813.55.21430.01~50.0031.85SWP-B0.8Polishing on Both Ends14.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 10284.819.13.51830.01~50.0031.85SWP-B0.8Polishing on Both Ends20.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 109.45.53.91.464.51~8.508.036SWP-B0.5Polishing on Both Ends5.520

234,775 IDR

20 Pieces Per Package

1 Pack(s) Same day 10145.55.40.9314.51~8.508.036SWP-B0.5Polishing on Both Ends7.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1020.55.57.60.6084.51~8.508.036SWP-B0.5Polishing on Both Ends10.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10305.510.60.4124.51~8.508.036SWP-B0.5Polishing on Both Ends14.520

241,500 IDR

10 Pieces Per Package

1 Pack(s) 15 Day(s) or more 1044.55.515.10.2744.51~8.508.036SWP-B0.5Polishing on Both Ends20.510

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 108.55.634.33.6858.51~16.0015.484SWP-B0.63Polishing on Both Ends5.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1012.55.635.82.3528.51~16.0015.484SWP-B0.63Polishing on Both Ends7.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1018.55.638.21.5198.51~16.0015.484SWP-B0.63Polishing on Both Ends10.520

241,500 IDR

10 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10265.6311.31.0298.51~16.0015.484SWP-B0.63Polishing on Both Ends14.510

241,500 IDR

10 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1038.55.6316.20.6968.51~16.0015.484SWP-B0.63Polishing on Both Ends20.510

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 108.35.85.69.52616.01~30.0025.97SWP-B0.8Polishing on Both Ends5.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10125.87.76.06616.01~30.0025.97SWP-B0.8Polishing on Both Ends7.520

241,500 IDR

181,898 IDR

20 Pieces Per Package

1 Pack(s) Same day 1017.55.810.93.9216.01~30.0025.97SWP-B0.8Polishing on Both Ends10.520

241,500 IDR

207,014 IDR

10 Pieces Per Package

1 Pack(s) Same day 1024.55.815.12.66616.01~30.0025.97SWP-B0.8Polishing on Both Ends14.510

241,500 IDR

10 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10365.821.51.80316.01~30.0025.97SWP-B0.8Polishing on Both Ends20.510

241,500 IDR

10 Pieces Per Package

1 Pack(s) 8 Day(s) or more 108.566.623.22630.01~50.0043.708SWP-B1Polishing on Both Ends5.510

241,500 IDR

10 Pieces Per Package

1 Pack(s) 8 Day(s) or more 10126914.79830.01~50.0043.708SWP-B1Polishing on Both Ends7.510

241,500 IDR

10 Pieces Per Package

1 Pack(s) Same day 1017612.69.56530.01~50.0043.708SWP-B1Polishing on Both Ends10.510

241,500 IDR

10 Pieces Per Package

1 Pack(s) 15 Day(s) or more 1024617.46.50730.01~50.0043.708SWP-B1Polishing on Both Ends14.510

241,500 IDR

10 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1034.5624.64.430.01~50.0043.708SWP-B1Polishing on Both Ends20.510

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1013.56.84.30.7254.51~8.506.566SWP-B0.5Polishing on Both Ends5.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 10206.860.4614.51~8.506.566SWP-B0.5Polishing on Both Ends7.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 14 Day(s) or more 10306.88.70.3044.51~8.506.566SWP-B0.5Polishing on Both Ends10.520

241,500 IDR

10 Pieces Per Package

1 Pack(s) 15 Day(s) or more 10446.812.20.2064.51~8.506.566SWP-B0.5Polishing on Both Ends14.510

241,500 IDR

10 Pieces Per Package

1 Pack(s) 15 Day(s) or more 10656.817.40.1374.51~8.506.566SWP-B0.5Polishing on Both Ends20.510

241,500 IDR

20 Pieces Per Package

1 Pack(s) 15 Day(s) or more 1011.56.934.61.8338.51~16.0012.446SWP-B0.63Polishing on Both Ends5.520

241,500 IDR

177,044 IDR

20 Pieces Per Package

1 Pack(s) Same day 10176.936.21.1668.51~16.0012.446SWP-B0.63Polishing on Both Ends7.520

241,500 IDR

20 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1025.56.938.90.7558.51~16.0012.446SWP-B0.63Polishing on Both Ends10.520

241,500 IDR

10 Pieces Per Package

1 Pack(s) 8 Day(s) or more 1036.56.9312.30.518.51~16.0012.446SWP-B0.63Polishing on Both Ends14.510

241,500 IDR

10 Pieces Per Package

1 Pack(s) 14 Day(s) or more 10546.9317.70.3438.51~16.0012.446SWP-B0.63Polishing on Both Ends20.510

Loading...

 

Basic Information

Solid Length(mm) 0

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)