(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 8:00 23/2/2025 sampai dengan 6:00 pada tanggal 24/2. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 23/2 to 6:00 (WIB) 24/2/2025. We apologize for the inconvenience.
  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Fitting for Steel Pipes, Screw-in Type Pipe Fitting, Reducing Socket (Part Numbers)

Fitting for Steel Pipes, Screw-in Type Pipe Fitting, Reducing Socket

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
RS-11/2X1/2B-B
RS-11/2X1/2B-W
RS-11/2X1B-B
RS-11/2X1B-W
RS-11/2X3/4B-B
RS-11/2X3/4B-W
RS-11/2X11/4B-B
RS-11/2X11/4B-W
RS-11/4X1/2B-B
RS-11/4X1/2B-W
RS-11/4X1B-B
RS-11/4X1B-W
RS-11/4X3/4B-B
RS-11/4X3/4B-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Nominal of Thread M2 Applicable Fluid Surface Treatment Band

95,838 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)1/2B(15A)Water / Air / Steam / OilNoNo

123,051 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

92,667 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)1B(25A)Water / Air / Steam / OilNoNo

92,625 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

95,838 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)3/4B(20A)Water / Air / Steam / OilNoNo

123,051 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

83,498 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)1 1/4B(32A)Water / Air / Steam / OilNoNo

92,625 IDR

1 Piece(s) 9 Day(s) or more 1 1/2B(40A)1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

80,882 IDR

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)1/2B(15A)Water / Air / Steam / OilNoNo

90,935 IDR

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

70,145 IDR

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)1B(25A)Water / Air / Steam / OilNoNo

82,146 IDR

1 Piece(s) 9 Day(s) or more 1 1/4B(32A)1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

73,399 IDR

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)3/4B(20A)Water / Air / Steam / OilNoNo

82,146 IDR

1 Piece(s) 9 Day(s) or more 1 1/4B(32A)3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

Loading...

Basic Information

Connecting Shape Socket Connection Type Screw⇔Screw Different Diameter Material Black heart malleable cast iron (FCMB27-05)
Connection Thread Type M1 Rc Connection Thread Type M2 Rc Type Fitting
Max. Operating Pressure(MPa) 2.5 Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)