(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Fitting for Steel Pipes, Screw-in Type Pipe Fitting, Reducing Socket

Fitting for Steel Pipes, Screw-in Type Pipe Fitting, Reducing Socket

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
BRS-3X1/2B-B
BRS-3X1B-B
BRS-3X2B-B
BRS-3X3/4B-B
BRS-3X11/2B-B
BRS-3X11/4B-B
BRS-3X21/2B-B
BRS-4X1B-B
BRS-4X2B-B
BRS-4X3/4B-B
BRS-4X3B-B
BRS-4X11/2B-B
BRS-4X11/4B-B
BRS-4X21/2B-B
BRS-5X4B-B
BRS-6X3B-B
BRS-6X4B-B
BRS-6X5B-B
BRS-21/2X1/2B-B
BRS-21/2X1B-B
BRS-21/2X2B-B
BRS-21/2X3/4B-B
BRS-21/2X11/2B-B
BRS-21/2X11/4B-B
RS-1/2X1/4B-B
RS-1/2X3/8B-B
RS-1/4X1/8B-B
RS-1X1/2B-B
RS-1X3/4B-B
RS-2X1/2B-B
RS-2X1B-B
RS-2X3/4B-B
RS-2X11/2B-B
RS-2X11/4B-B
RS-3/4X1/2B-B
RS-3/4X3/8B-B
RS-3/8X1/4B-B
RS-3/8X1/8B-B
RS-11/2X1/2B-B
RS-11/2X1B-B
RS-11/2X3/4B-B
RS-11/2X11/4B-B
RS-11/4X1/2B-B
RS-11/4X1B-B
RS-11/4X3/4B-B
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Nominal of Thread M2 Applicable Fluid Surface Treatment Band

391,968 IDR

1 Piece(s) 20 Day(s) or more 3B(80A)1/2B(15A)Water / Air / Steam / OilNoPresence

391,968 IDR

1 Piece(s) 20 Day(s) or more 3B(80A)1B(25A)Water / Air / Steam / OilNoPresence

344,471 IDR

1 Piece(s) 20 Day(s) or more 3B(80A)2B(50A)Water / Air / Steam / OilNoPresence

391,968 IDR

1 Piece(s) 20 Day(s) or more 3B(80A)3/4B(20A)Water / Air / Steam / OilNoPresence

391,968 IDR

1 Piece(s) 20 Day(s) or more 3B(80A)1 1/2B(40A)Water / Air / Steam / OilNoPresence

391,968 IDR

1 Piece(s) 20 Day(s) or more 3B(80A)1 1/4B(32A)Water / Air / Steam / OilNoPresence

344,471 IDR

1 Piece(s) 20 Day(s) or more 3B(80A)2 1/2B(65A)Water / Air / Steam / OilNoPresence

641,616 IDR

1 Piece(s) 20 Day(s) or more 4B(100A)1B(25A)Water / Air / Steam / OilNoPresence

641,616 IDR

1 Piece(s) 20 Day(s) or more 4B(100A)2B(50A)Water / Air / Steam / OilNoPresence

641,616 IDR

1 Piece(s) 20 Day(s) or more 4B(100A)3/4B(20A)Water / Air / Steam / OilNoPresence

572,823 IDR

1 Piece(s) 20 Day(s) or more 4B(100A)3B(80A)Water / Air / Steam / OilNoPresence

641,616 IDR

1 Piece(s) 20 Day(s) or more 4B(100A)1 1/2B(40A)Water / Air / Steam / OilNoPresence

641,616 IDR

1 Piece(s) 20 Day(s) or more 4B(100A)1 1/4B(32A)Water / Air / Steam / OilNoPresence

572,823 IDR

1 Piece(s) 20 Day(s) or more 4B(100A)2 1/2B(65A)Water / Air / Steam / OilNoPresence

1,157,479 IDR

1 Piece(s) 20 Day(s) or more 5B(125A)4B(100A)Water / Air / Steam / OilNoPresence

1,838,479 IDR

1 Piece(s) 20 Day(s) or more 6B(150A)3B(80A)Water / Air / Steam / OilNoPresence

1,586,463 IDR

1 Piece(s) 20 Day(s) or more 6B(150A)4B(100A)Water / Air / Steam / OilNoPresence

1,586,463 IDR

1 Piece(s) 20 Day(s) or more 6B(150A)5B(125A)Water / Air / Steam / OilNoPresence

261,988 IDR

1 Piece(s) 20 Day(s) or more 2 1/2B(65A)1/2B(15A)Water / Air / Steam / OilNoPresence

261,988 IDR

1 Piece(s) 20 Day(s) or more 2 1/2B(65A)1B(25A)Water / Air / Steam / OilNoPresence

222,605 IDR

1 Piece(s) 20 Day(s) or more 2 1/2B(65A)2B(50A)Water / Air / Steam / OilNoPresence

261,988 IDR

1 Piece(s) 20 Day(s) or more 2 1/2B(65A)3/4B(20A)Water / Air / Steam / OilNoPresence

222,605 IDR

1 Piece(s) 20 Day(s) or more 2 1/2B(65A)1 1/2B(40A)Water / Air / Steam / OilNoPresence

261,988 IDR

1 Piece(s) 20 Day(s) or more 2 1/2B(65A)1 1/4B(32A)Water / Air / Steam / OilNoPresence

37,280 IDR

1 Piece(s) 16 Day(s) or more 1/2B(15A)1/4B(8A)Water / Air / Steam / OilNoNo

37,280 IDR

1 Piece(s) 15 Day(s) or more 1/2B(15A)3/8B(10A)Water / Air / Steam / OilNoNo

41,924 IDR

1 Piece(s) 20 Day(s) or more 1/4B(8A)1/8B(6A)Water / Air / Steam / OilNoNo

50,695 IDR

1 Piece(s) 16 Day(s) or more 1B(25A)1/2B(15A)Water / Air / Steam / OilNoNo

46,313 IDR

1 Piece(s) 16 Day(s) or more 1B(25A)3/4B(20A)Water / Air / Steam / OilNoNo

131,163 IDR

1 Piece(s) 16 Day(s) or more 2B(50A)1/2B(15A)Water / Air / Steam / OilNoNo

131,163 IDR

1 Piece(s) 16 Day(s) or more 2B(50A)1B(25A)Water / Air / Steam / OilNoNo

131,163 IDR

1 Piece(s) 16 Day(s) or more 2B(50A)3/4B(20A)Water / Air / Steam / OilNoNo

117,810 IDR

1 Piece(s) 16 Day(s) or more 2B(50A)1 1/2B(40A)Water / Air / Steam / OilNoNo

114,937 IDR

1 Piece(s) 16 Day(s) or more 2B(50A)1 1/4B(32A)Water / Air / Steam / OilNoNo

41,333 IDR

1 Piece(s) 9 Day(s) or more 3/4B(20A)1/2B(15A)Water / Air / Steam / OilNoNo

39,860 IDR

1 Piece(s) 9 Day(s) or more 3/4B(20A)3/8B(10A)Water / Air / Steam / OilNoNo

41,924 IDR

1 Piece(s) 16 Day(s) or more 3/8B(10A)1/4B(8A)Water / Air / Steam / OilNoNo

41,924 IDR

1 Piece(s) 20 Day(s) or more 3/8B(10A)1/8B(6A)Water / Air / Steam / OilNoNo

95,838 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)1/2B(15A)Water / Air / Steam / OilNoNo

92,667 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)1B(25A)Water / Air / Steam / OilNoNo

95,838 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)3/4B(20A)Water / Air / Steam / OilNoNo

83,498 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)1 1/4B(32A)Water / Air / Steam / OilNoNo

80,882 IDR

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)1/2B(15A)Water / Air / Steam / OilNoNo

70,145 IDR

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)1B(25A)Water / Air / Steam / OilNoNo

73,399 IDR

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)3/4B(20A)Water / Air / Steam / OilNoNo

Loading...

  1. 1

Basic Information

Connecting Shape Socket Connection Type Screw⇔Screw Different Diameter Material Black heart malleable cast iron (FCMB27-05)
Connection Thread Type M1 Rc Connection Thread Type M2 Rc Type Fitting
Max. Operating Pressure(MPa) 2.5 Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)