(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 8:00 23/2/2025 sampai dengan 6:00 pada tanggal 24/2. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 23/2 to 6:00 (WIB) 24/2/2025. We apologize for the inconvenience.
  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Steel Pipe Fitting, Screw-In Pipe Fitting, Union Standard

Steel Pipe Fitting, Screw-In Pipe Fitting, Union Standard

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C or below), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
FU-1/2B-B
FU-1/2B-W
FU-1/4B-B
FU-1/4B-W
FU-1/8B-B
FU-1/8B-W
FU-1B-B
FU-1B-W
FU-2B-B
FU-2B-W
FU-3/4B-B
FU-3/4B-W
FU-3/8B-B
FU-3/8B-W
FU-3B-B
FU-3B-W
FU-4B-B
FU-4B-W
FU-11/2B-B
FU-11/2B-W
FU-11/4B-B
FU-11/4B-W
FU-21/2B-B
FU-21/2B-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment

74,174 IDR

1 Piece(s) 9 Day(s) or more 1/2B(15A)Water / Air / Steam / OilNo

82,171 IDR

1 Piece(s) 16 Day(s) or more 1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

85,695 IDR

1 Piece(s) 16 Day(s) or more 1/4B(8A)Water / Air / Steam / OilNo

119,167 IDR

1 Piece(s) 16 Day(s) or more 1/4B(8A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

85,695 IDR

1 Piece(s) 20 Day(s) or more 1/8B(6A)Water / Air / Steam / OilNo

88,908 IDR

1 Piece(s) 20 Day(s) or more 1/8B(6A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

120,007 IDR

1 Piece(s) 9 Day(s) or more 1B(25A)Water / Air / Steam / OilNo

130,418 IDR

1 Piece(s) 9 Day(s) or more 1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

340,584 IDR

1 Piece(s) 9 Day(s) or more 2B(50A)Water / Air / Steam / OilNo

356,683 IDR

1 Piece(s) 9 Day(s) or more 2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

88,569 IDR

1 Piece(s) 9 Day(s) or more 3/4B(20A)Water / Air / Steam / OilNo

118,667 IDR

1 Piece(s) 8 Day(s) or more 3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

85,695 IDR

1 Piece(s) 9 Day(s) or more 3/8B(10A)Water / Air / Steam / OilNo

119,167 IDR

1 Piece(s) 16 Day(s) or more 3/8B(10A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

980,526 IDR

1 Piece(s) 16 Day(s) or more 3B(80A)Water / Air / Steam / OilNo

995,046 IDR

1 Piece(s) 16 Day(s) or more 3B(80A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

1,866,030 IDR

1 Piece(s) 20 Day(s) or more 4B(100A)Water / Air / Steam / OilNo

1,622,972 IDR

1 Piece(s) 16 Day(s) or more 4B(100A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

242,647 IDR

1 Piece(s) 16 Day(s) or more 1 1/2B(40A)Water / Air / Steam / OilNo

244,666 IDR

1 Piece(s) 8 Day(s) or more 1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

172,068 IDR

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)Water / Air / Steam / OilNo

164,732 IDR

1 Piece(s) 16 Day(s) or more 1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

743,539 IDR

1 Piece(s) 16 Day(s) or more 2 1/2B(65A)Water / Air / Steam / OilNo

775,484 IDR

1 Piece(s) 16 Day(s) or more 2 1/2B(65A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

Loading...

  1. 1

Basic Information

Connecting Shape Union Connection Type Screw⇔Screw Same Diameter・Different Type Material STPG370(SCH40)
Connection Thread Type M1 Rc Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)