(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
This translation is a Google translation Terjemahan ini adalah terjemahan Google
For SGP tubes, copper tubes, thin walled stainless steel tubes (SU Molar pipe), and the U-bolts for electrical insulation. Soft PVC Coating
[Features]
· Superior electric insulation protects pipe surfaces from damage when coming into contact with support brackets.
· U-bolts: U-bolts have zinc zinc plating finish, plate is made from polypropylene.
· Dip stainless steel U-bolts: U-bolts made of SUS304, plate is made from polypropylene.
Japanese Only
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Main fit tube(or application tube)outside diameter (mm) | Material | Applicable Pipe Type | Surface Treatment | Size | Compatible Pipe Outer Diameter (mm) | Color |
---|---|---|---|---|---|---|---|---|---|---|---|
68,792 IDR | 1 Piece(s) | 16 Day(s) or more | 20~Less than 30 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-15 | 21.7 | Ivory | ||
70,482 IDR | 1 Piece(s) | 8 Day(s) or more | 20~Less than 30 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-20 | 27.2 | Ivory | ||
76,060 IDR | 1 Piece(s) | 16 Day(s) or more | 30~Less than 40 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-25 | 34 | Ivory | ||
86,033 IDR | 1 Piece(s) | 16 Day(s) or more | 40~Less than 50 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-32 | 42.7 | Ivory | ||
91,611 IDR | 1 Piece(s) | 8 Day(s) or more | 40~Less than 50 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-40 | 48.6 | Ivory | ||
95,000 IDR | 1 Piece(s) | 16 Day(s) or more | 60~Less than 70 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-50 | 60.5 | Ivory | ||
110,542 IDR | 1 Piece(s) | 16 Day(s) or more | 70~Less than 80 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-65 | 76.3 | Ivory | ||
110,667 IDR | 1 Piece(s) | 16 Day(s) or more | 80~Less than 90 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-80 | 89.1 | Ivory | ||
129,472 IDR | 1 Piece(s) | 16 Day(s) or more | 100~Less than 200 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-100 | 114.3 | Ivory | ||
507,500 IDR | 1 Piece(s) | 16 Day(s) or more | 100~Less than 200 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-125 | 139.8 | Ivory | ||
678,667 IDR | 1 Piece(s) | 16 Day(s) or more | 100~Less than 200 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-150 | 165.2 | Ivory | ||
892,667 IDR | 1 Piece(s) | 16 Day(s) or more | 200~Less than 300 | Steel | [Steel Pipe / Coated Steel Pipe] SGP Pipe | [Zinc Plating] Electrolytic Zinc Plating | SG-200 | 216.3 | Ivory | ||
37,692 IDR | 1 Piece(s) | 16 Day(s) or more | 1~Less than 10 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-8 | 9.53 | Black | ||
31,167 IDR | 1 Piece(s) | 16 Day(s) or more | 10~Less than 20 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-10 | 12.7 | Black | ||
30,833 IDR | 1 Piece(s) | 16 Day(s) or more | 10~Less than 20 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-15 | 15.88 | Black | ||
34,667 IDR | 1 Piece(s) | 16 Day(s) or more | 10~Less than 20 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-19 | 19.05 | Black | ||
28,833 IDR | 1 Piece(s) | 16 Day(s) or more | 20~Less than 30 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-20 | 22.22 | Black | ||
33,833 IDR | 1 Piece(s) | 16 Day(s) or more | 20~Less than 30 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-25 | 28.58 | Black | ||
43,167 IDR | 1 Piece(s) | 16 Day(s) or more | 30~Less than 40 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-32 | 34.92 | Black | ||
42,833 IDR | 1 Piece(s) | 16 Day(s) or more | 40~Less than 50 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-40 | 41.28 | Black | ||
45,500 IDR | 1 Piece(s) | 16 Day(s) or more | 50~Less than 60 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-50 | 53.98 | Black | ||
51,000 IDR | 1 Piece(s) | 17 Day(s) or more | 60~Less than 70 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-65 | 66.68 | Black | ||
59,167 IDR | 1 Piece(s) | 17 Day(s) or more | 70~Less than 80 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-80 | 79.38 | Black | ||
69,637 IDR | 1 Piece(s) | 17 Day(s) or more | 100~Less than 200 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-100 | 104.78 | Black | ||
43,167 IDR | 1 Piece(s) | 17 Day(s) or more | 20~Less than 30 | Steel | Copper Pipe | [Zinc Plating] Electrolytic Zinc Plating | CU-5 | 25.4 | Black | ||
39,720 IDR | 1 Piece(s) | 16 Day(s) or more | 10~Less than 20 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-13 | 15.88 | Blue | ||
38,500 IDR | 1 Piece(s) | 16 Day(s) or more | 20~Less than 30 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-20 | 22.22 | Blue | ||
42,762 IDR | 1 Piece(s) | 16 Day(s) or more | 20~Less than 30 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-25 | 28.58 | Blue | ||
53,667 IDR | 1 Piece(s) | 16 Day(s) or more | 30~Less than 40 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-30 | 34 | Blue | ||
60,167 IDR | 1 Piece(s) | 16 Day(s) or more | 40~Less than 50 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-40 | 42.7 | Blue | ||
73,333 IDR | 1 Piece(s) | 16 Day(s) or more | 40~Less than 50 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-50 | 48.6 | Blue | ||
71,667 IDR | 1 Piece(s) | 16 Day(s) or more | 60~Less than 70 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-60 | 60.5 | Blue | ||
84,500 IDR | 1 Piece(s) | 17 Day(s) or more | 70~Less than 80 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-75 | 76.3 | Blue | ||
92,667 IDR | 1 Piece(s) | 16 Day(s) or more | 80~Less than 90 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-80 | 89.1 | Blue | ||
100,333 IDR | 1 Piece(s) | 16 Day(s) or more | 100~Less than 200 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-100 | 114.3 | Blue | ||
425,500 IDR | 1 Piece(s) | 16 Day(s) or more | 100~Less than 200 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-125 | 139.8 | Blue | ||
511,333 IDR | 1 Piece(s) | 17 Day(s) or more | 100~Less than 200 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-150 | 165.2 | Blue | ||
829,000 IDR | 1 Piece(s) | 17 Day(s) or more | 200~Less than 300 | Steel | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | [Zinc Plating] Electrolytic Zinc Plating | SU-200 | 216.3 | Blue | ||
177,667 IDR | 1 Piece(s) | 17 Day(s) or more | 1~Less than 10 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-8 | 9.53 | Black | ||
177,667 IDR | 1 Piece(s) | 17 Day(s) or more | 10~Less than 20 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-10 | 12.7 | Black | ||
185,667 IDR | 1 Piece(s) | 17 Day(s) or more | 10~Less than 20 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-15 | 15.88 | Black | ||
190,500 IDR | 1 Piece(s) | 17 Day(s) or more | 10~Less than 20 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-19 | 19.05 | Black | ||
198,000 IDR | 1 Piece(s) | 17 Day(s) or more | 20~Less than 30 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-20 | 22.22 | Black | ||
205,667 IDR | 1 Piece(s) | 16 Day(s) or more | 20~Less than 30 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-25 | 28.58 | Black | ||
218,500 IDR | 1 Piece(s) | 17 Day(s) or more | 30~Less than 40 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-32 | 34.92 | Black | ||
228,833 IDR | 1 Piece(s) | 17 Day(s) or more | 40~Less than 50 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-40 | 41.28 | Black | ||
234,000 IDR | 1 Piece(s) | 17 Day(s) or more | 50~Less than 60 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-50 | 53.98 | Black | ||
244,167 IDR | 1 Piece(s) | 17 Day(s) or more | 60~Less than 70 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-65 | 66.68 | Black | ||
264,333 IDR | 1 Piece(s) | 17 Day(s) or more | 70~Less than 80 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-80 | 79.38 | Black | ||
287,333 IDR | 1 Piece(s) | 17 Day(s) or more | 100~Less than 200 | [Stainless Steel] SUS304 | Copper Pipe | No | CU-100 | 104.78 | Black | ||
241,667 IDR | 1 Piece(s) | 17 Day(s) or more | 10~Less than 20 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-13 | 15.88 | Blue | ||
265,167 IDR | 1 Piece(s) | 8 Day(s) or more | 20~Less than 30 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-20 | 22.22 | Blue | ||
296,333 IDR | 1 Piece(s) | 16 Day(s) or more | 20~Less than 30 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-25 | 28.58 | Blue | ||
324,500 IDR | 1 Piece(s) | 16 Day(s) or more | 30~Less than 40 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-30 | 34 | Blue | ||
346,833 IDR | 1 Piece(s) | 16 Day(s) or more | 40~Less than 50 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-40 | 42.7 | Blue | ||
379,500 IDR | 1 Piece(s) | 16 Day(s) or more | 40~Less than 50 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-50 | 48.6 | Blue | ||
393,000 IDR | 1 Piece(s) | 16 Day(s) or more | 60~Less than 70 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-60 | 60.5 | Blue | ||
423,000 IDR | 1 Piece(s) | 17 Day(s) or more | 70~Less than 80 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-75 | 76.3 | Blue | ||
447,000 IDR | 1 Piece(s) | 16 Day(s) or more | 80~Less than 90 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-80 | 89.1 | Blue | ||
495,667 IDR | 1 Piece(s) | 16 Day(s) or more | 100~Less than 200 | [Stainless Steel] SUS304 | [Stainless Steel Pipe] Stainless Steel Thin Wall Tube | No | SU-100 | 114.3 | Blue |
Loading...
Type | U-Bolt | Qty.(piece) | 1 |
---|
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Kebijakan Privacy
Thank you for your cooperation.Terima kasih atas kerjasama anda.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Silahkan pergunakan Forms Permintaan.
Kebijakan Privacy