(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

U-Shaped Bracket NC-U Bolt (SG / CU / SU)

U-Shaped Bracket NC-U Bolt (SG / CU / SU)

[Features]
▪ U-bolt for SGP tubes, copper tubes, stainless steel thin-walled tubes (SU Molar pipe), and electrical insulation.
▪ Nylon powder coating type.
▪ Nylon powder coating type with excellent electrical insulation and shock resistance properties.
▪ Heat resistance room temperature 100°C. (No abnormalities in data for test conducted under 150°C for 24 hours)
· U-bolt is zinc finished.
▪ Plate is made of Polypropylene.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A12113-0011
A12113-0026
A12113-0045
A12113-0050
A12113-0064
A12113-0079
A12113-0083
A12113-0098
A12113-0115
A12113-0120
A12113-0134
A12113-0149
A12113-0153
A12113-0168
A12113-0172
A12114-0019
A12114-0023
A12114-0038
A12114-0042
A12114-0057
A12114-0061
A12114-0076
A12114-0095
A12114-0108
A12114-0112
A12114-0127
A12114-0131
A12115-0016
A12115-0035
A12115-0040
A12115-0054
A12115-0069
A12115-0073
A12115-0088
A12115-0092
A12115-0105
A12115-0110
A12115-0124
A12115-0139
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Applicable Pipe Type Size Compatible Pipe Outer Diameter
(mm)
Color

89,500 IDR

1 Piece(s) 8 Day(s) or more 1~Less than 10Copper PipeCU-89.52Black

100,833 IDR

1 Piece(s) 17 Day(s) or more 10~Less than 20Copper PipeCU-1012.7Black

95,167 IDR

1 Piece(s) 21 Day(s) or more 10~Less than 20Copper PipeCU-1515.88Black

97,667 IDR

1 Piece(s) 17 Day(s) or more 10~Less than 20Copper PipeCU-1919.05Black

82,500 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30Copper PipeCU-2022.22Black

114,833 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30Copper PipeCU-525.4Black

98,333 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30Copper PipeCU-2528.58Black

103,167 IDR

1 Piece(s) 21 Day(s) or more 30~Less than 40Copper PipeCU-3234.92Black

122,167 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50Copper PipeCU-4041.28Black

140,500 IDR

1 Piece(s) 17 Day(s) or more 50~Less than 60Copper PipeCU-5053.98Black

164,500 IDR

1 Piece(s) 17 Day(s) or more 60~Less than 70Copper PipeCU-6566.68Black

165,500 IDR

1 Piece(s) 8 Day(s) or more 70~Less than 80Copper PipeCU-8079.38Black

186,167 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Copper PipeCU-100104.78Black

420,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Copper PipeCU-125130.18Black

572,833 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Copper PipeCU-150155.58Black

117,833 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30[Steel Pipe / Coated Steel Pipe] SGP PipeSG-1521.7Ivory

141,667 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30[Steel Pipe / Coated Steel Pipe] SGP PipeSG-2027.2Ivory

155,000 IDR

1 Piece(s) 21 Day(s) or more 30~Less than 40[Steel Pipe / Coated Steel Pipe] SGP PipeSG-2534Ivory

167,167 IDR

1 Piece(s) 23 Day(s) or more 40~Less than 50[Steel Pipe / Coated Steel Pipe] SGP PipeSG-3242.7Ivory

160,833 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50[Steel Pipe / Coated Steel Pipe] SGP PipeSG-4048.6Ivory

168,167 IDR

1 Piece(s) 23 Day(s) or more 60~Less than 70[Steel Pipe / Coated Steel Pipe] SGP PipeSG-5060.5Ivory

225,833 IDR

1 Piece(s) 26 Day(s) or more 70~Less than 80[Steel Pipe / Coated Steel Pipe] SGP PipeSG-6576.3Ivory

194,167 IDR

1 Piece(s) 17 Day(s) or more 80~Less than 90[Steel Pipe / Coated Steel Pipe] SGP PipeSG-8089.1Ivory

263,833 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200[Steel Pipe / Coated Steel Pipe] SGP PipeSG-100114.3Ivory

499,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200[Steel Pipe / Coated Steel Pipe] SGP PipeSG-125139.8Ivory

683,000 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200[Steel Pipe / Coated Steel Pipe] SGP PipeSG-150165.2Ivory

1,082,833 IDR

1 Piece(s) 21 Day(s) or more 200~Less than 300[Steel Pipe / Coated Steel Pipe] SGP PipeSG-200216.3Ivory

95,167 IDR

1 Piece(s) 17 Day(s) or more 10~Less than 20[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-1315.88Blue

99,000 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-2022.22Blue

96,500 IDR

1 Piece(s) 21 Day(s) or more 20~Less than 30[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-2528.58Blue

152,000 IDR

1 Piece(s) 17 Day(s) or more 30~Less than 40[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-3034Blue

164,000 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-4042.7Blue

158,667 IDR

1 Piece(s) 21 Day(s) or more 40~Less than 50[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-5048.6Blue

170,333 IDR

1 Piece(s) 17 Day(s) or more 60~Less than 70[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-6060.5Blue

208,500 IDR

1 Piece(s) 17 Day(s) or more 70~Less than 80[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-7576.3Blue

194,167 IDR

1 Piece(s) 17 Day(s) or more 80~Less than 90[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-8089.1Blue

209,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-100114.3Blue

499,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-125139.8Blue

683,000 IDR

1 Piece(s) 28 Day(s) or more 100~Less than 200[Stainless Steel Pipe] Stainless Steel Thin Wall TubeSU-150165.2Blue

Loading...

  1. 1

Basic Information

Type U-Bolt Material Steel Surface Treatment Electrolytic Zinc Plating
Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)