(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Suspension Pipe Fittings, with Tongue (Electro-Galvanized/Stainless Steel/Dip Plating) (Part Numbers)

Suspension Pipe Fittings, with Tongue (Electro-Galvanized/Stainless Steel/Dip Plating)

Hinge type handing band for SGP pipes and stainless steel pipes (thick pipes)

[Features]
· Hinged hanging band for use with SGP pipes.
· The "turnbuckle" is packed separately.
• Molten Zinc Finish

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10140-0010
A10140-0024
A10140-0039
A10140-0043
A10140-0058
A10140-0062
A10140-0077
A10140-0081
A10140-0096
A10140-0109
A10140-0113
A10140-0128
A10140-0132
A10140-0147
A10140-0151
A10140-0166
A10140-0185
A10140-0217
A10140-0221
A10140-0471
A10199-0017
A10199-0021
A10199-0036
A10199-0055
A10199-0060
A10199-0074
A10199-0089
A10199-0093
A10199-0106
A10199-0125
A10199-0130
A10199-0144
A10199-0159
A10199-0163
A10199-0178
A10221-0010
A10221-0024
A10221-0039
A10221-0043
A10221-0058
A10221-0062
A10221-0077
A10221-0081
A10221-0096
A10221-0109
A10221-0113
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Tube Type Surface Treatment Nominal Diameter (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

25,000 IDR

1 Piece(s) 8 Day(s) or more 10~Less than 20SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating10A3/817.3

10,979 IDR

1 Piece(s) 8 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

11,639 IDR

1 Piece(s) 8 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

11,859 IDR

1 Piece(s) 8 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A134

12,637 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

12,857 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

14,278 IDR

1 Piece(s) 8 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.5

17,797 IDR

1 Piece(s) 13 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

19,116 IDR

1 Piece(s) 8 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.1

27,500 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating90A3 1/2101.6

19,894 IDR

1 Piece(s) 8 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.3

63,438 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.8

70,475 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.2

229,667 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating175A7190.7

190,000 IDR

1 Piece(s) 11 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.3

622,833 IDR

1 Piece(s) 11 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating250A10267.4

878,000 IDR

1 Piece(s) 13 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating300A12318.5

28,222 IDR

1 Piece(s) 15 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc PlatingVP25V-2532

30,333 IDR

1 Piece(s) 15 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc PlatingVP30V-3038

23,832 IDR

1 Piece(s) 19 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc PlatingVP20V-2026

60,461 IDR

1 Piece(s) 12 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7

63,539 IDR

1 Piece(s) 8 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2

64,639 IDR

1 Piece(s) 8 Day(s) or more 30~Less than 40[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No25A134

67,616 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7

69,477 IDR

1 Piece(s) 8 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6

72,116 IDR

1 Piece(s) 8 Day(s) or more 60~Less than 70[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5

83,450 IDR

1 Piece(s) 13 Day(s) or more 70~Less than 80[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3

87,409 IDR

1 Piece(s) 13 Day(s) or more 80~Less than 90[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1

136,333 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No90A3 1/2101.6

101,145 IDR

1 Piece(s) 8 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3

347,130 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8

381,218 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2

910,500 IDR

1 Piece(s) 13 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No200A8216.3

2,017,333 IDR

1 Piece(s) 19 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No250A10267.4

2,220,833 IDR

1 Piece(s) 15 Day(s) or more 300~Less than 400[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No300A12318.5

65,000 IDR

1 Piece(s) 15 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)15A1/221.7

54,333 IDR

1 Piece(s) 13 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)20A3/427.2

61,833 IDR

1 Piece(s) 13 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)25A134

84,833 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)32A1 1/442.7

89,833 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)40A1 1/248.6

92,333 IDR

1 Piece(s) 13 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)50A260.5

100,569 IDR

1 Piece(s) 13 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)65A2 1/276.3

105,132 IDR

1 Piece(s) 13 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)80A389.1

110,035 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)100A4114.3

206,379 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)125A5139.8

240,183 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)150A6165.2

Loading...

  1. 1

Basic Information

Type Hanging Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)