(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 8:00 24/11/2024 sampai dengan 6:00 pada tanggal 25/11/2024. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 24/11/2024 to 6:00 (WIB) 25/11/2024. We apologize for the inconvenience.
  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Hanging Piping Bracket with No Assembled Hanging Turnbuckle (Zinc Plating/Stainless/Hot-Dip Galvanizing)

Hanging Piping Bracket with No Assembled Hanging Turnbuckle (Zinc Plating/Stainless/Hot-Dip Galvanizing)

Assembly type handing band for SGP and stainless steel pipes (thick pipes)

[Features]
· Assembled hanging band for use with SGP pipes.
· 250A or higher are made with ribless flat steel.
· Zinc electroplating finish

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10141-0017
A10141-0021
A10141-0036
A10141-0055
A10141-0060
A10141-0074
A10141-0089
A10141-0093
A10141-0106
A10141-0125
A10141-0130
A10141-0144
A10141-0159
A10141-0163
A10141-0178
A10141-0182
A10141-0197
A10200-0010
A10200-0024
A10200-0039
A10200-0043
A10200-0058
A10200-0062
A10200-0077
A10200-0081
A10200-0096
A10200-0109
A10200-0113
A10200-0128
A10200-0132
A10200-0147
A10200-0151
A11208-0027
A11208-0070
A11208-0084
A11208-0099
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Tube Type Surface Treatment Nominal Diameter (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

18,190 IDR

1 Piece(s) 13 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

17,962 IDR

1 Piece(s) 13 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

18,646 IDR

1 Piece(s) 13 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A134

19,786 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

17,167 IDR

1 Piece(s) 15 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

21,635 IDR

1 Piece(s) 15 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.5

31,101 IDR

1 Piece(s) 15 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

38,876 IDR

1 Piece(s) 15 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.1

68,962 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating90A3 1/2101.6

51,552 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.3

87,555 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.8

123,726 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.2

230,500 IDR

1 Piece(s) 13 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.3

599,833 IDR

1 Piece(s) 13 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating250A10267.4

728,500 IDR

1 Piece(s) 13 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating300A12318.5

905,833 IDR

1 Piece(s) 13 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.6

1,195,000 IDR

1 Piece(s) 13 Day(s) or more 400~Less than 500SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating400A16406.4

35,664 IDR

1 Piece(s) 15 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7

38,199 IDR

1 Piece(s) 15 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2

41,073 IDR

1 Piece(s) 15 Day(s) or more 30~Less than 40[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No25A134

44,961 IDR

1 Piece(s) 18 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7

47,328 IDR

1 Piece(s) 15 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6

50,833 IDR

1 Piece(s) 15 Day(s) or more 60~Less than 70[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5

96,333 IDR

1 Piece(s) 15 Day(s) or more 70~Less than 80[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3

106,000 IDR

1 Piece(s) 15 Day(s) or more 80~Less than 90[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1

127,000 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3

251,677 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8

453,667 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2

849,167 IDR

1 Piece(s) 15 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No200A8216.3

1,338,500 IDR

1 Piece(s) 15 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No250A10267.4

1,741,500 IDR

1 Piece(s) 15 Day(s) or more 300~Less than 400[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No300A12318.5

127,000 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No90A3 1/2101.6

36,339 IDR

1 Piece(s) 20 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)20A3/427.2

60,849 IDR

1 Piece(s) 20 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)50A260.5

98,034 IDR

1 Piece(s) 16 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)65A2 1/276.3

110,542 IDR

1 Piece(s) 16 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)80A389.1

Loading...

  1. 1

Basic Information

Type Hanging Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)