(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Pemberitahuan Jadwal Pemeliharaan : Situs ini akan tidak tersedia dikarenaka jadwal pemeliharaan mulai dari 8:00 24/11/2024 sampai dengan 6:00 pada tanggal 25/11/2024. Kami mohon maaf atas ketidaknyamanan yang terjadi.
    Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 8:00 24/11/2024 to 6:00 (WIB) 25/11/2024. We apologize for the inconvenience.
  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Suspend Pipe Fittings Assembly Type Tongue (Electro-Galvanized/Stainless Steel/Dip Plating)

Suspend Pipe Fittings Assembly Type Tongue (Electro-Galvanized/Stainless Steel/Dip Plating)

Assembly type handing band for the SGP pipe and the stainless steel pipe (thick pipe)

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10142-0014
A10142-0029
A10142-0033
A10142-0048
A10142-0052
A10142-0067
A10142-0071
A10142-0086
A10142-0118
A10142-0122
A10142-0137
A10142-0141
A10142-0156
A10142-0175
A10142-0180
A10142-0194
A10201-0017
A10201-0021
A10201-0036
A10201-0055
A10201-0060
A10201-0074
A10201-0089
A10201-0093
A10201-0106
A10201-0125
A10201-0130
A10201-0144
A10201-0159
A10201-0163
A10201-0337
A11209-0024
A11209-0039
A11209-0043
A11209-0081
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Tube Type Surface Treatment Nominal Diameter (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

9,338 IDR

1 Piece(s) 14 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

9,660 IDR

1 Piece(s) 11 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

10,100 IDR

1 Piece(s) 8 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A134

11,859 IDR

1 Piece(s) 11 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

12,739 IDR

1 Piece(s) 11 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

14,176 IDR

1 Piece(s) 13 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.5

22,093 IDR

1 Piece(s) 13 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

24,834 IDR

1 Piece(s) 8 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.1

30,772 IDR

1 Piece(s) 8 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.3

58,380 IDR

1 Piece(s) 14 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.8

81,251 IDR

1 Piece(s) 14 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.2

154,500 IDR

1 Piece(s) 15 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.3

342,167 IDR

1 Piece(s) 18 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating250A10267.4

914,333 IDR

1 Piece(s) 16 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating300A12318.5

1,065,333 IDR

1 Piece(s) 13 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.6

1,413,333 IDR

1 Piece(s) 17 Day(s) or more 400~Less than 500SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating400A16406.4

48,703 IDR

1 Piece(s) 15 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7

48,923 IDR

1 Piece(s) 19 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2

50,902 IDR

1 Piece(s) 19 Day(s) or more 30~Less than 40[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No25A134

57,280 IDR

1 Piece(s) 15 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7

60,241 IDR

1 Piece(s) 11 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6

65,299 IDR

1 Piece(s) 11 Day(s) or more 60~Less than 70[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5

103,683 IDR

1 Piece(s) 15 Day(s) or more 70~Less than 80[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3

110,280 IDR

1 Piece(s) 19 Day(s) or more 80~Less than 90[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1

124,795 IDR

1 Piece(s) 19 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3

361,205 IDR

1 Piece(s) 18 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8

469,844 IDR

1 Piece(s) 18 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2

1,024,500 IDR

1 Piece(s) 15 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No200A8216.3

3,053,667 IDR

1 Piece(s) 15 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No250A10267.4

1,966,333 IDR

1 Piece(s) 15 Day(s) or more 300~Less than 400[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No300A12318.5

183,333 IDR

1 Piece(s) 19 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No90A3 1/2101.6

68,455 IDR

1 Piece(s) 14 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)20A3/427.2

84,833 IDR

1 Piece(s) 15 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)25A134

93,500 IDR

1 Piece(s) 15 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)32A1 1/442.7

155,833 IDR

1 Piece(s) 12 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)80A389.1

Loading...

  1. 1

Basic Information

Type Hanging Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)