(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Riser Clamp, Riser Clamp / CL Riser Clamp (Electrogalvanized / Stainless Steel) (Part Numbers)

Riser Clamp, Riser Clamp / CL Riser Clamp (Electrogalvanized / Stainless Steel)

Dedicated floor band for SGP pipe, stainless steel pipe, surface coated steel pipe, copper pipe, cast iron drainage pipe, and fire resistant dual pipe (FDP),
Floor Band for SGP pipe (vibration proof auxiliary)

[Features]
· A10408 floor band: floor band for SGP pipe, electrogalvanized finish.
· A10423 stainless steel floor band: floor band for stainless steel copper pipe.
· A10410CL floor band: floor band for surface coated steel pipe, electrogalvanized finish.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10408-0019
A10408-0023
A10408-0038
A10408-0042
A10408-0057
A10408-0061
A10408-0076
A10408-0095
A10408-0108
A10408-0112
A10408-0127
A10408-0131
A10408-0146
A10408-0165
A10410-0017
A10410-0021
A10410-0036
A10410-0055
A10410-0060
A10410-0089
A10410-0093
A10410-0106
A10423-0015
A10423-0020
A10423-0034
A10423-0049
A10423-0053
A10423-0068
A10423-0072
A10423-0087
A10423-0091
A10423-0104
A10424-0012
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Compatible Pipe Type Material Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

35,167 IDR

1 Piece(s) 12 Day(s) or more 20~Less than 30[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating15A1/221.7

30,833 IDR

1 Piece(s) 13 Day(s) or more 20~Less than 30[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating20A3/427.2

33,667 IDR

1 Piece(s) 13 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating25A134

37,500 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating32A1 1/442.7

39,167 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating40A1 1/248.6

50,667 IDR

1 Piece(s) 13 Day(s) or more 60~Less than 70[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating50A260.5

66,426 IDR

1 Piece(s) 13 Day(s) or more 70~Less than 80[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating65A2 1/276.3

64,833 IDR

1 Piece(s) 13 Day(s) or more 80~Less than 90[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating80A389.1

76,167 IDR

1 Piece(s) 11 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating100A4114.3

136,167 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating125A5139.8

154,167 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating150A6165.2

328,000 IDR

1 Piece(s) 15 Day(s) or more 200~Less than 300[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating200A8216.3

449,500 IDR

1 Piece(s) 14 Day(s) or more 200~Less than 300[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating250A10267.4

747,833 IDR

1 Piece(s) 14 Day(s) or more 300~Less than 400[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating300A12318.5

64,905 IDR

1 Piece(s) 15 Day(s) or more 20~Less than 30[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating15A-25.7

69,130 IDR

1 Piece(s) 15 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating20A-31.2

73,018 IDR

1 Piece(s) 15 Day(s) or more 30~Less than 40[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating25A-37.6

78,259 IDR

1 Piece(s) 15 Day(s) or more 40~Less than 50[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating32A-46.3

82,990 IDR

1 Piece(s) 15 Day(s) or more 50~Less than 60[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating40A-52.2

107,499 IDR

1 Piece(s) 15 Day(s) or more 70~Less than 80[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating65A-79.9

121,528 IDR

1 Piece(s) 15 Day(s) or more 90~Less than 100[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating80A-92.7

126,937 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating100A-118.3

312,667 IDR

1 Piece(s) 13 Day(s) or more 20~Less than 30Stainless Steel PipeStainless SteelNo15A1/221.7

367,667 IDR

1 Piece(s) 13 Day(s) or more 20~Less than 30Stainless Steel PipeStainless SteelNo20A3/427.2

388,333 IDR

1 Piece(s) 13 Day(s) or more 30~Less than 40Stainless Steel PipeStainless SteelNo25A134

431,000 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50Stainless Steel PipeStainless SteelNo32A1 1/442.7

509,000 IDR

1 Piece(s) 13 Day(s) or more 40~Less than 50Stainless Steel PipeStainless SteelNo40A1 1/248.6

514,500 IDR

1 Piece(s) 13 Day(s) or more 60~Less than 70Stainless Steel PipeStainless SteelNo50A260.5

622,500 IDR

1 Piece(s) 13 Day(s) or more 70~Less than 80Stainless Steel PipeStainless SteelNo65A2 1/276.3

561,167 IDR

1 Piece(s) 15 Day(s) or more 80~Less than 90Stainless Steel PipeStainless SteelNo80A389.1

698,833 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200Stainless Steel PipeStainless SteelNo100A4114.3

1,701,833 IDR

1 Piece(s) 14 Day(s) or more 100~Less than 200Stainless Steel PipeStainless SteelNo125A5139.8

275,500 IDR

1 Piece(s) 20 Day(s) or more 20~Less than 30[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeStainless SteelNo15A1/225.7

Loading...

  1. 1

Basic Information

Type Floor Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)