(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Riser Clamp, Riser Clamp / CL Riser Clamp (Electrogalvanized / Stainless Steel)

Riser Clamp, Riser Clamp / CL Riser Clamp (Electrogalvanized / Stainless Steel)

Dedicated floor band for SGP pipe, stainless steel pipe, surface coated steel pipe, copper pipe, cast iron drainage pipe, and fire resistant dual pipe (FDP),
Floor Band for SGP pipe (vibration proof auxiliary)

[Features]
· A10408 floor band: floor band for SGP pipe, electrogalvanized finish.
· A10423 stainless steel floor band: floor band for stainless steel copper pipe.
· A10410CL floor band: floor band for surface coated steel pipe, electrogalvanized finish.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10408-0108
A10408-0112
A10408-0127
A10410-0106
A10423-0091
A10423-0104
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Compatible Pipe Type Material Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

76,167 IDR

1 Piece(s) 11 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating100A4114.3

136,167 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating125A5139.8

154,167 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] SGP PipeSteelElectrolytic Zinc Plating150A6165.2

126,937 IDR

1 Piece(s) 15 Day(s) or more 100~Less than 200[Steel Tubes / Coated Steel Tubes] Outer Surface Coated Steel PipeSteelElectrolytic Zinc Plating100A-118.3

698,833 IDR

1 Piece(s) 13 Day(s) or more 100~Less than 200Stainless Steel PipeStainless SteelNo100A4114.3

1,701,833 IDR

1 Piece(s) 14 Day(s) or more 100~Less than 200Stainless Steel PipeStainless SteelNo125A5139.8

Loading...

  1. 1

Basic Information

Type Floor Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)