(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel)

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel)

[Features]
• Urethane foam with U-bolts for adjusting the piping level.
• UP type is designed to adjust the height of the piping.
• No thermal insulation effect is provided.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10640-0055
A10640-0060
A10640-0074
A10640-0089
A10640-0093
A10640-0106
A10640-0125
A10640-0130
A10640-0144
A10640-0159
A10640-0163
A10640-0178
A10640-0182
A10640-0197
A10640-0200
A10640-0214
A10640-0229
A10640-0233
A10640-0248
A10640-0252
A10640-0267
A10640-0271
A10640-0286
A10640-0303
A10640-0318
A10640-0322
A10640-0337
A10640-0341
A10640-0356
A10640-0375
A10640-0380
A10640-0394
A10640-0407
A10640-0411
A10640-0426
A10640-0445
A10640-0450
A10640-0464
A10640-0479
A10640-0483
A10640-0498
A10640-0515
A10640-0534
A10640-0549
A10640-0604
A10640-0619
A10649-0012
A10649-0027
A10649-0031
A10649-0046
A10649-0065
A10649-0070
A10649-0084
A10649-0099
A10649-0101
A10649-0116
A10649-0135
A10649-0140
A10649-0154
A10649-0169
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)
Heat-Retention Thickness T
(mm)

118,992 IDR

1 Piece(s) 20 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.740

102,667 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.220

110,833 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.225

78,833 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.230

115,833 IDR

1 Piece(s) 17 Day(s) or more 20~Less than 30Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.240

89,500 IDR

1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13420

82,167 IDR

1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13425

88,000 IDR

1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13430

129,000 IDR

1 Piece(s) 17 Day(s) or more 30~Less than 40Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A13440

85,833 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.720

90,500 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.725

91,500 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.730

143,667 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.740

96,333 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.620

99,667 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.625

103,167 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.630

160,333 IDR

1 Piece(s) 17 Day(s) or more 40~Less than 50Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.640

104,500 IDR

1 Piece(s) 17 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.520

109,167 IDR

1 Piece(s) 17 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.525

113,833 IDR

1 Piece(s) 17 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.530

176,833 IDR

1 Piece(s) 17 Day(s) or more 60~Less than 70Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.540

141,667 IDR

1 Piece(s) 17 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.320

137,167 IDR

1 Piece(s) 17 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.325

145,500 IDR

1 Piece(s) 17 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.330

194,167 IDR

1 Piece(s) 17 Day(s) or more 70~Less than 80Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.340

141,667 IDR

1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.120

153,333 IDR

1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.125

160,500 IDR

1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.130

211,167 IDR

1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.140

260,333 IDR

1 Piece(s) 17 Day(s) or more 80~Less than 90Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.150

168,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.325

175,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.330

229,333 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.340

283,333 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.350

248,167 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.825

258,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.830

311,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.840

346,667 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.850

280,667 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.225

292,167 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.230

346,667 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.240

388,333 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.250

383,000 IDR

1 Piece(s) 17 Day(s) or more 200~Less than 300Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.340

484,500 IDR

1 Piece(s) 17 Day(s) or more 200~Less than 300Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.350

1,220,500 IDR

1 Piece(s) 25 Day(s) or more 300~Less than 400Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.640

1,489,667 IDR

1 Piece(s) 25 Day(s) or more 300~Less than 400Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating350A14355.650

185,167 IDR

1 Piece(s) 20 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.720

188,833 IDR

1 Piece(s) 20 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.725

195,167 IDR

1 Piece(s) 20 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.730

218,833 IDR

1 Piece(s) 20 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.740

198,833 IDR

1 Piece(s) 21 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.220

202,167 IDR

1 Piece(s) 21 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.225

211,167 IDR

1 Piece(s) 21 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.230

224,833 IDR

1 Piece(s) 21 Day(s) or more 20~Less than 30[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.240

222,167 IDR

1 Piece(s) 8 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13420

229,167 IDR

1 Piece(s) 21 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13425

235,833 IDR

1 Piece(s) 21 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13430

252,500 IDR

1 Piece(s) 21 Day(s) or more 30~Less than 40[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No25A13440

215,500 IDR

1 Piece(s) 21 Day(s) or more 40~Less than 50[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.720

235,833 IDR

1 Piece(s) 21 Day(s) or more 40~Less than 50[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.725

Loading...

Basic Information

Type Urethane U-Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)