(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel) (Part Numbers)

Urethane, / Urethane UP Type (Electro-Galvanized / Stainless Steel)

[Features]
• Urethane foam with U-bolts for adjusting the piping level.
• UP type is designed to adjust the height of the piping.
• No thermal insulation effect is provided.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10640-0380
A10640-0394
A10640-0407
A10640-0411
A10640-0426
A10640-0445
A10640-0450
A10640-0464
A10640-0479
A10640-0483
A10640-0498
A10640-0515
A10649-0366
A10649-0385
A10649-0390
A10649-0402
A10649-0417
A10649-0421
A10649-0436
A10649-0455
A10649-0460
A10649-0474
A10649-0489
A10649-0493
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)
Heat-Retention Thickness T
(mm)

168,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.325

175,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.330

229,333 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.340

283,333 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.350

248,167 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.825

258,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.830

311,500 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.840

346,667 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.850

280,667 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.225

292,167 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.230

346,667 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.240

388,333 IDR

1 Piece(s) 17 Day(s) or more 100~Less than 200Steel[Steel Pipe / Coated Steel Pipe] SGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.250

381,500 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.325

394,000 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.330

408,167 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.340

464,167 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.350

623,000 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.825

639,667 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.830

673,333 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.840

715,167 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.850

673,333 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.225

710,333 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.230

740,667 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.240

785,167 IDR

1 Piece(s) 21 Day(s) or more 100~Less than 200[Stainless Steel] Stainless Steel[Stainless Steel Pipe] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.250

Loading...

  1. 1

Basic Information

Type Urethane U-Band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)