(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Pipe Fittings Assembly Flange (Part Numbers)

Pipe Fittings Assembly Flange

A plumbing fitting that uses a screw connection for small/medium-diameter steel pipes. Follows JIS B 2301 specification for a screw-type malleable cast iron pipe fitting. Hot zinc plating reduces effect on environment.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Part Number

Configured Part Number is shown.

 
Part Number
F-10A-W
F-15A-B
F-15A-W
F-20A-B
F-20A-W
F-25A-B
F-25A-W
F-32A-B
F-32A-W
F-40A-B
F-40A-W
F-50A-B
F-50A-W
F-65A-B
F-65A-W
F-80A-B
F-80A-W
F-100A-B
F-100A-W
F-125A-W
F-150A-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment Tightening Bolt

234,561 IDR

1 Piece(s) 16 Day(s) or more 3/8B(10A)[Zinc Plating] Hot zinc platingM10

223,726 IDR

1 Piece(s) 15 Day(s) or more 1/2B(15A)[Not Provided] NoM10

223,726 IDR

1 Piece(s) 15 Day(s) or more 1/2B(15A)[Zinc Plating] Hot zinc platingM10

238,947 IDR

1 Piece(s) 15 Day(s) or more 3/4B(20A)[Not Provided] NoM10

238,947 IDR

1 Piece(s) 15 Day(s) or more 3/4B(20A)[Zinc Plating] Hot zinc platingM10

253,395 IDR

1 Piece(s) 15 Day(s) or more 1B(25A)[Not Provided] NoM10

253,395 IDR

1 Piece(s) 15 Day(s) or more 1B(25A)[Zinc Plating] Hot zinc platingM10

370,012 IDR

1 Piece(s) 15 Day(s) or more 1 1/4B(32A)[Not Provided] NoM12

370,012 IDR

1 Piece(s) 15 Day(s) or more 1 1/4B(32A)[Zinc Plating] Hot zinc platingM12

397,101 IDR

1 Piece(s) 15 Day(s) or more 1 1/2B(40A)[Not Provided] NoM12

397,101 IDR

1 Piece(s) 15 Day(s) or more 1 1/2B(40A)[Zinc Plating] Hot zinc platingM12

463,924 IDR

1 Piece(s) 15 Day(s) or more 2B(50A)[Not Provided] NoM12

463,924 IDR

1 Piece(s) 15 Day(s) or more 2B(50A)[Zinc Plating] Hot zinc platingM12

839,570 IDR

1 Piece(s) 16 Day(s) or more 2 1/2B(65A)[Not Provided] NoM16

839,570 IDR

1 Piece(s) 16 Day(s) or more 2 1/2B(65A)[Zinc Plating] Hot zinc platingM16

933,482 IDR

1 Piece(s) 16 Day(s) or more 3B(80A)[Not Provided] NoM16

933,482 IDR

1 Piece(s) 16 Day(s) or more 3B(80A)[Zinc Plating] Hot zinc platingM16

1,358,664 IDR

1 Piece(s) 16 Day(s) or more 4B(100A)[Not Provided] NoM16

1,358,664 IDR

1 Piece(s) 16 Day(s) or more 4B(100A)[Zinc Plating] Hot zinc platingM16

2,545,203 IDR

1 Piece(s) 16 Day(s) or more 5B(125A)[Zinc Plating] Hot zinc platingM16

2,978,642 IDR

1 Piece(s) 16 Day(s) or more 6B(150A)[Zinc Plating] Hot zinc platingM20

Loading...

  1. 1

Basic Information

Connecting Shape Set flange Connection Type Flange Material FCMB27-05
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 2.5 Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)