(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Pipe Fitting, Cap (With Clamp)

Pipe Fitting, Cap (With Clamp)

A plumbing fitting that uses a screw connection for small/medium-diameter steel pipes. Follows JIS B 2301 specification for a screw-type malleable cast iron pipe fitting. Hot zinc plating reduces effect on environment.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Part Number

Configured Part Number is shown.

 
Part Number
BCA-8A-W
BCA-10A-W
BCA-15A-W
BCA-20A-W
BCA-25A-W
BCA-32A-W
BCA-40A-W
BCA-50A-W
BCA-65A-W
BCA-80A-W
BCA-100A-W
BCA-125A-W
BCA-150A-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

42,867 IDR

1 Piece(s) 16 Day(s) or more 1/4B(8A)[Zinc Plating] Hot zinc plating

44,886 IDR

1 Piece(s) 8 Day(s) or more 3/8B(10A)[Zinc Plating] Hot zinc plating

42,048 IDR

1 Piece(s) 8 Day(s) or more 1/2B(15A)[Zinc Plating] Hot zinc plating

47,208 IDR

1 Piece(s) 8 Day(s) or more 3/4B(20A)[Zinc Plating] Hot zinc plating

56,238 IDR

1 Piece(s) 8 Day(s) or more 1B(25A)[Zinc Plating] Hot zinc plating

77,137 IDR

1 Piece(s) 8 Day(s) or more 1 1/4B(32A)[Zinc Plating] Hot zinc plating

87,714 IDR

1 Piece(s) 8 Day(s) or more 1 1/2B(40A)[Zinc Plating] Hot zinc plating

112,529 IDR

1 Piece(s) 16 Day(s) or more 2B(50A)[Zinc Plating] Hot zinc plating

186,054 IDR

1 Piece(s) 16 Day(s) or more 2 1/2B(65A)[Zinc Plating] Hot zinc plating

260,379 IDR

1 Piece(s) 16 Day(s) or more 3B(80A)[Zinc Plating] Hot zinc plating

563,835 IDR

1 Piece(s) 16 Day(s) or more 4B(100A)[Zinc Plating] Hot zinc plating

1,096,795 IDR

1 Piece(s) 16 Day(s) or more 5B(125A)[Zinc Plating] Hot zinc plating

1,524,042 IDR

1 Piece(s) 16 Day(s) or more 6B(150A)[Zinc Plating] Hot zinc plating

Loading...

  1. 1

Basic Information

Connecting Shape Cap Connection Type Pitch (Terminal) Material FCMB27-05
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 2.5 Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No
Band Presence

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)