(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Pipe Fitting, Male and Female Elbow

Pipe Fitting, Male and Female Elbow

[Features]
· Pipe fitting manufactured from cold rolled steel plate (SPCC) are also available. A standard ‘Screwed Type Malleable Cast Iron Pipe Fitting’ as specified by JIS B 2301. We also manufacture some non-JIS standard products.
· The main material is Mareburu® (blackheart malleable cast iron). The threaded section has a tapered pipe thread. Hot-dip galvanized surface treatment is applied where the surface is processed.
· Hot-dip galvanization has been changed to a superior plating that reduces the environmental burden (RoSH compliant).
· Environmentally friendly: Lead and cadmium are significantly reduced.
· We use high-purity zinc metal that largely reduces the inclusion content of lead (Pb) and cadmium (Cd).
· Superior manufacturing method: No addition of new heavy metals is required.
· Mass production technology has been established by developing a unique production facility and preprocessing method. Heavy metals including bismuth (Bi) are used to replace of lead.
· Excellent performance: The appearance and performance is equivalent to conventional plated parts.
· Conforms to the specifications that are specified in JIS B 2301 (Screwed Type Malleable Cast Iron Pipe Fittings). The fitting has an exterior glossy plated finish—similar to the conventional products.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Part Number

Configured Part Number is shown.

 
Part Number
RSL-15X10A-B
RSL-15X10A-W
RSL-20X15A-W
RSL-25X20A-W
RSL-32X25A-W
RSL-40X32A-B
RSL-40X32A-W
RSL-50X40A-W
SL-6A-B
SL-6A-W
SL-8A-B
SL-8A-W
SL-10A-B
SL-10A-W
SL-15A-B
SL-15A-W
SL-20A-B
SL-20A-W
SL-25A-B
SL-25A-W
SL-32A-W
SL-40A-W
SL-50A-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipRoHSConnection Type Nominal of Thread M1 Nominal of Thread M2 Surface Treatment

52,414 IDR

280 Piece(s) 18 Day(s) or more -Screw⇔Screw Different Diameter1/2B(15A)3/8B(10A)[Not Provided] No

58,009 IDR

1 Piece(s) 11 Day(s) or more -Screw⇔Screw Different Diameter1/2B(15A)3/8B(10A)[Zinc Plating] Hot zinc plating

84,876 IDR

4 Piece(s) 13 Day(s) or more -Screw⇔Screw Different Diameter3/4B(20A)1/2B(15A)[Zinc Plating] Hot zinc plating

93,694 IDR

1 Piece(s) 13 Day(s) or more -Screw⇔Screw Different Diameter1B(25A)3/4B(20A)[Zinc Plating] Hot zinc plating

126,460 IDR

1 Piece(s) 13 Day(s) or more -Screw⇔Screw Different Diameter1 1/4B(32A)1B(25A)[Zinc Plating] Hot zinc plating

154,065 IDR

40 Piece(s) 18 Day(s) or more -Screw⇔Screw Different Diameter1 1/2B(40A)1 1/4B(32A)[Not Provided] No

154,065 IDR

1 Piece(s) 13 Day(s) or more -Screw⇔Screw Different Diameter1 1/2B(40A)1 1/4B(32A)[Zinc Plating] Hot zinc plating

244,623 IDR

1 Piece(s) 13 Day(s) or more -Screw⇔Screw Different Diameter2B(50A)1 1/2B(40A)[Zinc Plating] Hot zinc plating

46,222 IDR

1 Piece(s) 13 Day(s) or more 10Screw⇔Screw Same Diameter・Different Type1/8B(6A)1/8B(6A)[Not Provided] No

47,982 IDR

1 Piece(s) 11 Day(s) or more -Screw⇔Screw Same Diameter・Different Type1/8B(6A)1/8B(6A)[Zinc Plating] Hot zinc plating

46,222 IDR

210 Piece(s) 13 Day(s) or more -Screw⇔Screw Same Diameter・Different Type1/4B(8A)1/4B(8A)[Not Provided] No

47,982 IDR

1 Piece(s) 11 Day(s) or more -Screw⇔Screw Same Diameter・Different Type1/4B(8A)1/4B(8A)[Zinc Plating] Hot zinc plating

46,222 IDR

140 Piece(s) 13 Day(s) or more -Screw⇔Screw Same Diameter・Different Type3/8B(10A)3/8B(10A)[Not Provided] No

47,982 IDR

1 Piece(s) 11 Day(s) or more -Screw⇔Screw Same Diameter・Different Type3/8B(10A)3/8B(10A)[Zinc Plating] Hot zinc plating

42,610 IDR

140 Piece(s) 13 Day(s) or more -Screw⇔Screw Same Diameter・Different Type1/2B(15A)1/2B(15A)[Not Provided] No

42,823 IDR

1 Piece(s) 10 Day(s) or more -Screw⇔Screw Same Diameter・Different Type1/2B(15A)1/2B(15A)[Zinc Plating] Hot zinc plating

46,802 IDR

10 Piece(s) 16 Day(s) or more -Screw⇔Screw Same Diameter・Different Type3/4B(20A)3/4B(20A)[Not Provided] No

45,660 IDR

1 Piece(s) 11 Day(s) or more -Screw⇔Screw Same Diameter・Different Type3/4B(20A)3/4B(20A)[Zinc Plating] Hot zinc plating

68,668 IDR

1 Piece(s) 13 Day(s) or more -Screw⇔Screw Same Diameter・Different Type1B(25A)1B(25A)[Not Provided] No

68,106 IDR

1 Piece(s) Same day -Screw⇔Screw Same Diameter・Different Type1B(25A)1B(25A)[Zinc Plating] Hot zinc plating

99,885 IDR

1 Piece(s) 12 Day(s) or more -Screw⇔Screw Same Diameter・Different Type1 1/4B(32A)1 1/4B(32A)[Zinc Plating] Hot zinc plating

129,814 IDR

1 Piece(s) 12 Day(s) or more -Screw⇔Screw Same Diameter・Different Type1 1/2B(40A)1 1/2B(40A)[Zinc Plating] Hot zinc plating

186,540 IDR

1 Piece(s) 11 Day(s) or more -Screw⇔Screw Same Diameter・Different Type2B(50A)2B(50A)[Zinc Plating] Hot zinc plating

Loading...

  1. 1

Basic Information

Connecting Shape Female Male Elbows Material FCMB27-05 Connection Thread Type M1 Rc
Connection Thread Type M2 R Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 2.5 Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No
Band Presence

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)