(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

SB Type Spiral Bevel Gearbox (Part Numbers)

SB Type Spiral Bevel Gearbox

Silent, powerful and robust bevel gearbox with abundant selectable shaft arrangements that can be used for a wide range of applications

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
SB45-1-12
SB45-1-13
SB45-1-21
SB45-1-22
SB45-1-23
SB45-1-31
SB45-1-32
SB45-1-33
SB45-1-41
SB45-1-42
SB45-1-43
SB45-1-51
SB45-1-52
SB45-1-53
SB45-1-61
SB45-1-62
SB45-1-63
SB45-1-71
SB45-1-72
SB45-1-73
SB45-1-81
SB45-1-82
SB45-1-83
SB45-2-11
SB45-2-12
SB45-2-13
SB45-2-21
SB45-2-22
SB45-2-23
SB45-2-31
SB45-2-32
SB45-2-33
SB45-2-41
SB45-2-42
SB45-2-43
SB45-2-51
SB45-2-52
SB45-2-53
SB45-2-61
SB45-2-62
SB45-2-63
SB45-2-71
SB45-2-72
SB45-2-73
SB45-2-81
SB45-2-82
SB45-2-83
SB50-1-11
SB50-1-12
SB50-1-13
SB50-1-21
SB50-1-22
SB50-1-23
SB50-1-31
SB50-1-32
SB50-1-33
SB50-1-41
SB50-1-42
SB50-1-43
SB50-1-51
SB50-1-52
SB50-1-53
SB50-1-61
SB50-1-62
SB50-1-63
SB50-1-71
SB50-1-72
SB50-1-73
SB50-1-81
SB50-1-82
SB50-1-83
SB50-1-233B
SB50-2-11
SB50-2-12
SB50-2-13
SB50-2-21
SB50-2-22
SB50-2-23
SB50-2-31
SB50-2-32
SB50-2-33
SB50-2-41
SB50-2-42
SB50-2-43
SB50-2-51
SB50-2-52
SB50-2-53
SB50-2-61
SB50-2-62
SB50-2-63
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipRoHSReduction Ratio Axis Dia.
(φ)
Output Shaft Placement Model number (shaft diameter) Axis arrangement (rotation direction)

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Left Side45(45)12

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Two shafts /left side and right side of output shafts45(45)13

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Right Side45(45)21

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Left Side45(45)22

40,361,014 IDR

1 Piece(s) 28 Day(s) or more 10145Two shafts /left side and right side of output shafts45(45)23

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Top Half45(45)31

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Bottom Half45(45)32

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Two shafts /top half and bottom half of output shafts45(45)33

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Top Half45(45)41

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Bottom Half45(45)42

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Two shafts /top half and bottom half of output shafts45(45)43

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Left Side45(45)51

40,361,014 IDR

1 Piece(s) 28 Day(s) or more 10145Right Side45(45)52

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Two shafts /left side and right side of output shafts45(45)53

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Left Side45(45)61

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Right Side45(45)62

40,361,014 IDR

1 Piece(s) 28 Day(s) or more 10145Two shafts /left side and right side of output shafts45(45)63

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Right Side45(45)71

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Left Side45(45)72

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Two shafts /left side and right side of output shafts45(45)73

40,361,014 IDR

1 Piece(s) 28 Day(s) or more 10145Right Side45(45)81

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Left Side45(45)82

40,361,014 IDR

1 Piece(s) 24 Day(s) or more 10145Two shafts /left side and right side of output shafts45(45)83

44,217,262 IDR

1 Piece(s) 28 Day(s) or more 10245Right Side45(45)11

44,217,262 IDR

1 Piece(s) 28 Day(s) or more 10245Left Side45(45)12

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Two shafts /left side and right side of output shafts45(45)13

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Right Side45(45)21

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Left Side45(45)22

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Two shafts /left side and right side of output shafts45(45)23

44,217,262 IDR

1 Piece(s) 28 Day(s) or more 10245Top Half45(45)31

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Bottom Half45(45)32

44,217,262 IDR

1 Piece(s) 28 Day(s) or more 10245Two shafts /top half and bottom half of output shafts45(45)33

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Top Half45(45)41

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Bottom Half45(45)42

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Two shafts /top half and bottom half of output shafts45(45)43

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Left Side45(45)51

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Right Side45(45)52

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Two shafts /left side and right side of output shafts45(45)53

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Left Side45(45)61

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Right Side45(45)62

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Two shafts /left side and right side of output shafts45(45)63

44,217,262 IDR

1 Piece(s) 28 Day(s) or more 10245Right Side45(45)71

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Left Side45(45)72

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Two shafts /left side and right side of output shafts45(45)73

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Right Side45(45)81

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Left Side45(45)82

44,217,262 IDR

1 Piece(s) 24 Day(s) or more 10245Two shafts /left side and right side of output shafts45(45)83

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Right Side50(50)11

52,499,722 IDR

1 Piece(s) 28 Day(s) or more 10150Left Side50(50)12

52,499,722 IDR

1 Piece(s) 24 Day(s) or more 10150Two shafts /left side and right side of output shafts50(50)13

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Right Side50(50)21

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Left Side50(50)22

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Two shafts /left side and right side of output shafts50(50)23

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Top Half50(50)31

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Bottom Half50(50)32

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Two shafts /top half and bottom half of output shafts50(50)33

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Top Half50(50)41

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Bottom Half50(50)42

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Two shafts /top half and bottom half of output shafts50(50)43

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Left Side50(50)51

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Right Side50(50)52

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Two shafts /left side and right side of output shafts50(50)53

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Left Side50(50)61

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Right Side50(50)62

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Two shafts /left side and right side of output shafts50(50)63

52,126,337 IDR

1 Piece(s) 28 Day(s) or more 10150Right Side50(50)71

52,126,337 IDR

1 Piece(s) 28 Day(s) or more 10150Left Side50(50)72

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Two shafts /left side and right side of output shafts50(50)73

52,126,337 IDR

1 Piece(s) 28 Day(s) or more 10150Right Side50(50)81

52,126,337 IDR

1 Piece(s) 28 Day(s) or more 10150Left Side50(50)82

52,126,337 IDR

1 Piece(s) 24 Day(s) or more 10150Two shafts /left side and right side of output shafts50(50)83

89,071,007 IDR

1 Piece(s) 17 Day(s) or more 10150-50(50)233B

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Right Side50(50)11

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Left Side50(50)12

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Two shafts /left side and right side of output shafts50(50)13

57,801,044 IDR

1 Piece(s) 28 Day(s) or more 10250Right Side50(50)21

57,801,044 IDR

1 Piece(s) 28 Day(s) or more 10250Left Side50(50)22

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Two shafts /left side and right side of output shafts50(50)23

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Top Half50(50)31

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Bottom Half50(50)32

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Two shafts /top half and bottom half of output shafts50(50)33

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Top Half50(50)41

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Bottom Half50(50)42

57,801,044 IDR

1 Piece(s) 28 Day(s) or more 10250Two shafts /top half and bottom half of output shafts50(50)43

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Left Side50(50)51

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Right Side50(50)52

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Two shafts /left side and right side of output shafts50(50)53

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Left Side50(50)61

57,801,044 IDR

1 Piece(s) 28 Day(s) or more 10250Right Side50(50)62

57,801,044 IDR

1 Piece(s) 24 Day(s) or more 10250Two shafts /left side and right side of output shafts50(50)63

Loading...

Basic Information

Mounting Class With Leg Type Spiral Bevel Gear With or Without Motors No
Output Shaft Type Solid Axial direction Direct axis

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)