(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.

  • Penghentian penjualan kategori produk pneumatik Seri Ekonomi (E-series). Info Detail
    Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

SB Type Spiral Bevel Gearbox (Part Numbers)

SB Type Spiral Bevel Gearbox

Silent, powerful and robust bevel gearbox with abundant selectable shaft arrangements that can be used for a wide range of applications

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
SB25-1-22
SB25-1-23
SB25-1-31
SB25-1-32
SB25-1-33
SB25-1-41
SB25-1-42
SB25-1-43
SB25-1-51
SB25-1-52
SB25-1-53
SB25-1-61
SB25-1-62
SB25-1-63
SB25-1-71
SB25-1-72
SB25-1-73
SB25-1-81
SB25-1-82
SB25-1-83
SB25-1-111
SB25-1-112
SB25-1-113
SB25-1-121
SB25-1-122
SB25-1-123
SB25-1-131
SB25-1-132
SB25-1-133
SB25-1-141
SB25-1-142
SB25-1-143
SB25-1-151
SB25-1-152
SB25-1-153
SB25-1-161
SB25-1-162
SB25-1-163
SB25-2-11
SB25-2-12
SB25-2-13
SB25-2-21
SB25-2-22
SB25-2-23
SB25-2-31
SB25-2-32
SB25-2-33
SB25-2-41
SB25-2-42
SB25-2-43
SB25-2-51
SB25-2-52
SB25-2-53
SB25-2-61
SB25-2-62
SB25-2-63
SB25-2-71
SB25-2-72
SB25-2-73
SB25-2-81
SB25-2-82
SB25-2-83
SB25-2-111
SB25-2-112
SB25-2-113
SB25-2-121
SB25-2-122
SB25-2-123
SB25-2-131
SB25-2-132
SB25-2-133
SB25-2-141
SB25-2-142
SB25-2-143
SB25-2-151
SB25-2-152
SB25-2-153
SB25-2-161
SB25-2-162
SB25-2-163
SB30-1-11
SB30-1-12
SB30-1-13
SB30-1-21
SB30-1-22
SB30-1-23
SB30-1-31
SB30-1-32
SB30-1-33
SB30-1-41
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipRoHSReduction Ratio Axis Dia.
(φ)
Output Shaft Placement Model number (shaft diameter) Axis arrangement (rotation direction)

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Left Side25(25)22

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Two shafts /left side and right side of output shafts25(25)23

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Top Half25(25)31

13,427,716 IDR

1 Piece(s) 26 Day(s) or more 10125Bottom Half25(25)32

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Two shafts /top half and bottom half of output shafts25(25)33

13,427,716 IDR

1 Piece(s) 26 Day(s) or more 10125Top Half25(25)41

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Bottom Half25(25)42

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Two shafts /top half and bottom half of output shafts25(25)43

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Left Side25(25)51

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Right Side25(25)52

13,427,716 IDR

1 Piece(s) 26 Day(s) or more 10125Two shafts /left side and right side of output shafts25(25)53

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Left Side25(25)61

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Right Side25(25)62

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Two shafts /left side and right side of output shafts25(25)63

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Right Side25(25)71

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Left Side25(25)72

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Two shafts /left side and right side of output shafts25(25)73

13,427,716 IDR

1 Piece(s) 26 Day(s) or more 10125Right Side25(25)81

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Left Side25(25)82

13,427,716 IDR

1 Piece(s) 22 Day(s) or more 10125Two shafts /left side and right side of output shafts25(25)83

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)111

16,823,917 IDR

1 Piece(s) 28 Day(s) or more 10125-25(25)112

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)113

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)121

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)122

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)123

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)131

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)132

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)133

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)141

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)142

16,823,917 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)143

18,893,168 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)151

18,893,168 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)152

18,893,168 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)153

18,893,168 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)161

18,893,168 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)162

18,893,168 IDR

1 Piece(s) 24 Day(s) or more 10125-25(25)163

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Right Side25(25)11

15,935,850 IDR

1 Piece(s) 26 Day(s) or more 10225Left Side25(25)12

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Two shafts /left side and right side of output shafts25(25)13

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Right Side25(25)21

15,935,850 IDR

1 Piece(s) 26 Day(s) or more 10225Left Side25(25)22

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Two shafts /left side and right side of output shafts25(25)23

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Top Half25(25)31

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Bottom Half25(25)32

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Two shafts /top half and bottom half of output shafts25(25)33

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Top Half25(25)41

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Bottom Half25(25)42

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Two shafts /top half and bottom half of output shafts25(25)43

15,935,850 IDR

1 Piece(s) 26 Day(s) or more 10225Left Side25(25)51

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Right Side25(25)52

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Two shafts /left side and right side of output shafts25(25)53

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Left Side25(25)61

15,935,850 IDR

1 Piece(s) 26 Day(s) or more 10225Right Side25(25)62

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Two shafts /left side and right side of output shafts25(25)63

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Right Side25(25)71

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Left Side25(25)72

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Two shafts /left side and right side of output shafts25(25)73

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Right Side25(25)81

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Left Side25(25)82

15,935,850 IDR

1 Piece(s) 22 Day(s) or more 10225Two shafts /left side and right side of output shafts25(25)83

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)111

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)112

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)113

19,755,431 IDR

1 Piece(s) 28 Day(s) or more 10225-25(25)121

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)122

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)123

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)131

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)132

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)133

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)141

19,755,431 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)142

19,755,431 IDR

1 Piece(s) 28 Day(s) or more 10225-25(25)143

22,403,036 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)151

22,403,036 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)152

22,403,036 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)153

22,403,036 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)161

22,403,036 IDR

1 Piece(s) 28 Day(s) or more 10225-25(25)162

22,403,036 IDR

1 Piece(s) 24 Day(s) or more 10225-25(25)163

19,980,576 IDR

1 Piece(s) 28 Day(s) or more 10132Right Side30(32)11

19,980,576 IDR

1 Piece(s) 24 Day(s) or more 10132Left Side30(32)12

19,980,576 IDR

1 Piece(s) 24 Day(s) or more 10132Two shafts /left side and right side of output shafts30(32)13

19,980,576 IDR

1 Piece(s) 24 Day(s) or more 10132Right Side30(32)21

19,980,576 IDR

1 Piece(s) 28 Day(s) or more 10132Left Side30(32)22

19,980,576 IDR

1 Piece(s) 24 Day(s) or more 10132Two shafts /left side and right side of output shafts30(32)23

19,980,576 IDR

1 Piece(s) 24 Day(s) or more 10132Top Half30(32)31

19,980,576 IDR

1 Piece(s) 24 Day(s) or more 10132Bottom Half30(32)32

19,980,576 IDR

1 Piece(s) 24 Day(s) or more 10132Two shafts /top half and bottom half of output shafts30(32)33

19,980,576 IDR

1 Piece(s) 24 Day(s) or more 10132Top Half30(32)41

Loading...

Basic Information

Mounting Class With Leg Type Spiral Bevel Gear With or Without Motors No
Output Shaft Type Solid Axial direction Direct axis

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:021-8990-4102 / FAX:021-8990-5803
8:30am - 5:30pm (Monday - Friday)